Profit First for Construction FAQ
Setting your allocation percentages: CAPs and TAPs explained
These answers show the method for setting your own percentages; the numbers have to come from your books, not a chart.
Related topics:Getting started: the basics, bank accounts, and taxesOwner mindset and money habitsAllocation rhythm and mechanics
How to set CAPs and TAPs
What is the relationship between retainage and my Target Allocation Percentages?
The short answer
Retainage is a collection-timing and working-capital issue, not a reason to change your Target Allocation Percentages. When retainage is collected, it goes into your Income account and is allocated at your normal percentages like any other payment.
Why it’s different in construction
Construction contractors routinely wait 30 to 90 days, or longer on public work, to collect the retainage held back on each pay app. That gap can slow your progress toward your TAPs because less cash is flowing in during that period, even though the revenue is earned. The financing cost of waiting is real, and it belongs in your bid price and cash planning, not in a modified allocation table. Tracking unreleased retainage in your AR aging keeps you aware of what’s coming without inventing a separate account or percentage adjustment for it.
From the field
A mechanical contractor with about eight employees was convinced that retainage was wrecking his allocation system. Every time a big retainage check finally landed, he’d bump his JobEx percentage for that quarter because he assumed the money was “already spoken for.” The result was that Profit and Owner’s Comp never moved; he was always reallocating away from them. Once he understood that retainage is just income arriving late, he stopped adjusting percentages and let the normal allocation rhythm handle it. Within two quarters, his Profit account was building steadily for the first time, and he stopped dreading the end of each job.
From the book, Chapter 14, pp. 208, 210
I had a retainage check come in about a month ago from an old job, and I didn’t know what to do with it all or how to handle it.” […] Now, I get it, but what you need to consider are the consequences of changing allocation percentages arbitrarily or for one large deposit.” […] “I can only give you general advice,” I said, “and the first thing I would tell you is to allocate the money in the usual proportions.
Where people get it wrong
A common mistake is treating retainage as a special category that deserves its own allocation percentage, a higher JobEx buffer, or a dedicated reserve account. None of that is correct. Retainage is ordinary income that arrives on a delay; when it comes in, it goes through your normal allocations unchanged.
In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.
What’s the difference between CAPs and TAPs, and which one do I start with?
The short answer
CAPs (Current Allocation Percentages) show where your cash is actually going right now; TAPs (Target Allocation Percentages) are the allocation goals you set based on your own business numbers and what a healthy version of your company looks like, and you always start with CAPs, because you can’t set a useful target until you know your honest starting point.
From the field
When a concrete contractor with about 25 field staff first ran through the CAP exercise, he expected to see roughly what he’d always assumed about his business. Instead, his job costs as a percentage of revenue were running noticeably higher than he’d thought, and his owner’s compensation percentage was effectively zero; he’d been drawing cash informally whenever it was there, which wasn’t often. Setting his TAPs gave him a target to aim at, but more importantly, the gap between the two told him exactly where to focus: his estimating needed tightening, and a couple of overhead line items had grown without anyone noticing. He made one small percentage shift at the end of his first quarter, moving two points from OpEx toward Owner’s Comp, and committed to reviewing the numbers again at the next quarter-end. Eighteen months later his CAPs and TAPs were close enough that the business felt like it was running on purpose instead of by accident.
From the book, Chapter 5, p. 88
I shared my experience doing the exercise on the fly at RGC with Roger, Alex, and Pam and asked them all to guess the figure we’d come up with. Many were surprised to hear that RGC wasn’t making as much as they thought. Pretty much across the board, their own initial estimates were off by much more than they had expected. Though a couple of them got close, everyone had overestimated their profit, some more than others. They all agreed that it was a great learning experience and had given them a deeper appreciation for what RGC was experiencing.
Where people get it wrong
One common mistake is trying to set TAPs using industry or trade benchmark percentages: what other concrete contractors supposedly allocate, or what a consultant says is typical for your market. The book is clear that TAPs come from your own numbers and your own goals. A benchmark from outside your business tells you nothing useful about your pricing, your crew efficiency, or your overhead structure. Start with what your company is actually doing, then set targets that reflect where your specific business needs to go.
In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.
How do I set the right JobEx Target Allocation Percentage (TAP) for my trade?
The short answer
Your JobEx TAP starts with your own historical numbers (what you’ve actually spent on materials, subcontractors, job-specific rentals, bonds, and permits as a percentage of total revenue) and then becomes a goal you move toward gradually as you tighten pricing and job cost control.
Why it’s different in construction
The JobEx/OpEx boundary is where plumbing, mechanical, and other trade contractors most often get confused, especially around labor. The key question for any worker is whether that pay exists only because a job exists: if you’d pay someone regardless of whether a specific job is running, that cost behaves like OpEx, not JobEx. Subcontractors, whether 1099 or W-2, go into JobEx because they’re paid for job work and that cost disappears when the job does. Getting this boundary right before you set your TAP is the work; the percentage follows from it.
From the field
A plumbing contractor with about 40 employees had been lumping all field labor into job cost for years, including his two lead foremen who stayed on payroll year-round regardless of project load. When he built his CAPs from 12 months of actual data, his JobEx percentage looked higher than it really was, and his Owner’s Comp TAP ended up set too low as a result. Once he moved the foremen’s pay to OpEx (where it actually belonged), his JobEx percentage dropped by several points, his OpEx percentage rose to reflect reality, and his TAP targets became goals he could actually work toward. Within two quarters, his pricing had caught up and he was seeing his first consistent Profit account balance.
From the book, Chapter 2, p. 34
They passed me their slips of paper and I read out the results: “Alex said 80%. Pam has 75%, Dan says 55%, and Roger has 70% for materials and subs.” “Who is right?” Pam asked. “None of you,” I said. “When I added up those categories just now and divided the total by the revenue, your best year showed that they were actually over 90% of the total revenue.” “No way,” Dan said. I flipped my notepad around to show them that over the last five years, 90% or more of the revenues that came in were in fact represented by materials and subcontractors. “In some years, they were actually greater than 100% compared to revenue,” I said.
Where people get it wrong
A common mistake is to look up a trade-average JobEx percentage and use that as your TAP. Your TAP has to come from your own 12-month history and your own goals: no industry benchmark will account for your mix of self-perform versus sub work, your market, or your crew structure.
In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.
How do I calculate Real Revenue correctly in construction?
The short answer
Real Revenue is your total construction revenue minus JobEx: the direct job costs that go away when the job goes away, including materials, subcontractors, job-specific rentals, bonds, and permits. What’s left is the money available to cover your operating costs and carve out profit, owner’s pay, and taxes.
Why it’s different in construction
Construction is full of pass-through dollars: a large contract might send most of its value straight to subs and suppliers before you touch it. If you run your allocation math against gross revenue, you’ll think you have far more to work with than you actually do. Stripping out JobEx first gives you a realistic picture of what the business actually earns. For labor, the question is whether the worker is paid only when job work exists, which makes it JobEx, or kept on regardless of current job activity, which makes it OpEx; payroll status alone (W-2 or 1099) doesn’t settle it.
From the field
A husband-and-wife masonry shop had been running the numbers off their gross revenue for years and couldn’t figure out why the percentages never worked out. Their materials and sub costs were high relative to their contract volume, so their Real Revenue was much thinner than their top line suggested. Once they sat down and pulled twelve months of actual JobEx out of their revenue, their Real Revenue came out to roughly $380,000 on about $1.1 million in contracts, less than half of what they’d been mentally budgeting against. That single recalculation showed them their OpEx was eating almost everything left over, and they had almost nothing for owner’s pay or profit. They repriced two recurring job types within the next quarter and started seeing Residual Revenue they could actually allocate.
From the book, Chapter 2, p. 32
Humor me and let’s just say you make 30% as you previously stated on your jobs. Let’s also assume all of the costs are materials and subs. That means your costs are 70% of the total revenue, right?” “Right,” said Alex. “Understood.” “So if we’re calling you a two-million-dollar contractor and 70% goes out to materials and subs, then you are really a six-hundred-thousand-dollar contractor.” […] If 70% of the revenue that comes in has to go out in materials and subcontractors, that isn’t your money.”
Where people get it wrong
Some contractors try to classify labor purely by tax status: if someone is on a W-2, they assume it’s OpEx; if 1099, it’s JobEx. That’s not the right test. The question is whether the cost goes away when the job goes away. A long-term field employee you keep on between projects is OpEx. A crew you bring in specifically for one job and release when it’s done is JobEx. Get that distinction right before you calculate Real Revenue or your allocations will be off from the start.
In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.
How do I know if my current allocations are working before I tweak them?
The short answer
Your allocations are working when your CAPs are moving toward your TAPs, your accounts are covering their obligations without chronic borrowing, and your pricing and collections hold up across the quarter, not just in a good week. Progress counts even before CAPs reach TAPs.
Why it’s different in construction
Construction cash flow is lumpy by nature: pay apps arrive in batches, deposits front-load some jobs, and slow collection months can make a healthy allocation look broken when it isn’t. Before concluding that percentages need to change, check whether the pressure is seasonal or tied to a billing lag rather than a structural problem. Pricing is worth watching too: if JobEx keeps outrunning its allocation, the bid may be the issue, not the percentage.
From the field
A service and maintenance HVAC contractor with about 15 employees had been running Profit First for roughly six months. The owner kept feeling like the system wasn’t working because the OpEx account looked thin in January and February every year. When we pulled the numbers across a full 12-month period, the CAPs were actually tightening toward the TAPs; the winter dip was a seasonal pattern, not a systemic failure. Instead of resetting percentages in February, the owner started building a small Drip reserve during the busy fall months to cover the slow stretch. By the following winter, the accounts held steady through the slow period without any mid-quarter adjustments, and the owner had real evidence that the allocations were doing their job.
From the book, Chapter 10, pp. 164 to 165
“I ran short on my OpEx account,” Mark said. “I’m not sure why, but I borrowed it from my JobEx account.” “It is common, when you get going, to find that you may not have set your allocation percentages correctly,” I said. “Maybe there was something wrong in your initial calculations. But think about the reason you ran short. Was it something that came up unexpectedly?” “A big repair bill and my workers’ comp renewal payment hit at the same time,” Mark said. […] “The renewal payment does happen at the same time every year, but it has always been a scramble to cover it. I like the thought of anticipating and keeping up with it.”
Where people get it wrong
A common mistake is treating a few tight weeks as proof that the allocation percentages are wrong and making changes on the spot. Mid-quarter adjustments almost never make sense: a short run of cash pressure is usually a reason to diagnose the root cause and draw on reserves, not to reset the system. Stable, consistent percentages give you the data you need to make a good decision at quarter-end.
In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.
How do I move from my current CAPs to my TAPs without breaking cash flow?
The short answer
Moving from CAPs to TAPs works best in small, deliberate steps: nudging Profit, Owner’s Compensation, and Tax up by a point or two each quarter while working on pricing and job efficiency to create the room. Profit First for Construction is built on the idea that you can’t get to your targets overnight, but you can get there steadily without disrupting the cash flow your jobs and overhead depend on.
Why it’s different in construction
A concrete contractor with 15 employees carries significant fixed labor costs, equipment obligations, and material lead times that make cash flow sensitive to even small percentage shifts. Jumping allocations too fast can leave JobEx short mid-project or squeeze OpEx below what it takes to keep the office and field running. The right pace accounts for your current backlog, seasonal patterns, and any legacy job commitments that are still running at the old cost structure. New work bid at improved margins gives you the headroom to raise allocations; existing work at thin margins doesn’t.
From the field
A concrete contractor had been in business for 12 years and had never paid himself a consistent salary; whatever was left at the end of the month was his. When he calculated his CAPs for the first time, he found that Profit, Owner’s Comp, and Tax together added up to less than 4% of revenue. His TAPs felt impossibly far away. Rather than trying to close the gap in one quarter, he raised each of the three accounts by one percentage point per quarter and focused on tightening his material costs and sub pricing on new bids. Eighteen months later, his combined Profit, Owner’s Comp, and Tax allocation had more than doubled, and he was taking a regular paycheck for the first time in over a decade. The business never missed a payroll or a supplier payment during the transition.
From the book, Chapter 10, p. 168
“I’m still a long way from the profitability I think I should have,” Mark said. “That’s OK,” I said. “It often takes several quarters to get where we want to be. Shift a few percentage points every quarter and you’ll set yourself up for long-term success.”
Where people get it wrong
Some contractors try to accelerate the CAP-to-TAP transition by adjusting percentages mid-quarter whenever an account runs short or a big check comes in. That approach creates instability and masks whether the system is actually working. Allocation percentages should stay fixed during the quarter; if an account runs short, cover it from reserves and diagnose the cause at quarter-end. Don’t keep moving the dials.
In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.
How often should I raise my allocation percentages?
The short answer
Allocation percentages should change only at quarter-end, in small, sustainable steps toward your own TAP goals, never mid-quarter because of routine cash pressure or a short-term account dip.
Why it’s different in construction
Construction cash flow is lumpy by nature: a big pay app lands one week and nothing comes in for three weeks after that. That kind of short-term variation looks alarming but is often just the normal billing cycle, not a signal that your percentages are wrong. Check your seasonal pattern and cover the gap from reserves before you even think about touching your allocations.
From the field
A commercial drywall and framing sub with about 40 employees had been adjusting their JobEx percentage almost every time a slow pay period hit. The owner figured that if an account ran short, the percentages must be off. After two years of constant tinkering, their allocations were a moving target and their Profit account had never grown past a few hundred dollars. They committed to locking percentages for a full quarter, covered one tight stretch from their Vault, and did a proper review at quarter-end. By the end of the second quarter on that discipline, the Profit account had built to roughly $18,000, more than it had ever held. The lesson wasn’t that the percentages were finally right; it was that stability let them actually see what the numbers were telling them.
From the book, Chapter 10, pp. 165 to 166
“I watched it slowly build, and it looks like I may actually have extra in my JobEx account,” Paul answered. “That’s good,” I said. “I often advise people to put extra money in that account so they avoid getting into the habit of borrowing from the next job.” “So what do you think I should do?” Paul asked. “If you feel like you won’t need it for job expenses,” I said, “maybe you can shave a percentage point or two from that account going into this quarter and reallocate it to your Owner’s Compensation or Profit account.” “I like the thought of that,” Paul said. “Ultimately, that’s how you start finding more profit in your business,” I said.
Where people get it wrong
A common mistake is treating a two- or three-week account shortfall as proof that percentages need an immediate fix. That almost always turns out to be a timing issue or a seasonal dip, not a systemic problem. The right move is to cover the gap from reserves and wait for the quarter-end review to decide whether a real adjustment is warranted.
In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.
How do I know if my target allocations are realistic for my type of work?
The short answer
Start by calculating your Current Allocation Percentages from your own last 12 months of revenue, JobEx, and OpEx. Those numbers tell you where cash is actually going. Then set Target Allocation Percentages as goals to work toward gradually, not as industry benchmarks handed to you by trade or contract type.
Why it’s different in construction
A design-build GC carries a different cost structure than a specialty sub, and a second-generation family business may have legacy overhead that a newer shop doesn’t. Because construction cost profiles vary so much by project type, delivery method, and company history, targets built from your own numbers are far more useful than any table that claims to show what a GC or a design-build firm “should” allocate. The goal is to understand your own baseline first, then set targets that stretch you toward profitability without being disconnected from reality.
From the field
The second-generation owner of a design-build GC came in convinced his margins were fine because he’d always heard that design-build firms run leaner overhead than traditional GCs. When we built his CAPs from his actual numbers, the story was different: his OpEx percentage was higher than he realized because he’d added staff during a growth push and never recalibrated. His initial TAPs were optimistic, partly because he was anchoring to what he thought the numbers should look like rather than what his business actually produced. We backed the targets off to something achievable within two to three quarters and made small adjustments at each quarter-end. Within a year his allocations were moving in the right direction and he had a clear picture of where the overhead drag was coming from.
From the book, Chapter 5, p. 90
“I used exactly what my previous company did,” Mark said. “I did all the bidding over there and made plenty of money. We are in the same industry, but now that I’m on my own, I never seem to cover my overhead with that factor. What am I doing wrong?” […] Even in the same trade, a large company will have a different overhead factor than a small one because they can usually spread that over more revenue. Was your previous company larger than yours is now?” “It was,” Mark replied.
Where people get it wrong
A persistent myth is that there are standard allocation percentages for different trades or contract types: that a GC should hit a certain JobEx percentage, or that design-build work justifies a different Profit target. Profit First for Construction doesn’t use industry benchmark tables. Your CAPs come from your own history, and your TAPs are your own goals. Using someone else’s numbers as a target is a good way to set yourself up for either chronic shortfalls or false confidence.
In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.
Should I use percentages or flat-dollar amounts for my Profit First allocations?
The short answer
Profit First for Construction runs on percentages for the core allocations (Income, JobEx, OpEx, Profit, Owner’s Comp, and Tax) because percentages scale automatically with revenue, which matters a lot when construction billing is lumpy and unpredictable.
Why it’s different in construction
Paving, roofing, and other trade contractors often have wide swings between a slow month and a heavy billing month. A flat-dollar allocation that works in February can leave accounts overfunded or starved in August. Percentages move with the money coming in, which is exactly what you need when pay apps and deposit timing are uneven. That said, flat-dollar thinking is useful for planning purposes: knowing roughly how many dollars you need in reserves or that a specific tax payment is due helps you sanity-check whether your percentages are doing the job.
From the field
A second-generation paving contractor had been running the business on a rough mental model: set aside a fixed dollar amount each month for taxes and hope the rest worked out. When a big municipal job came in with a large upfront deposit followed by slow monthly pay apps, the fixed-dollar approach fell apart; some months he was over-reserving, others he was short. After switching to percentage-based allocations through Profit First for Construction, every dollar that came in got split the same way regardless of size. The big deposit funded all accounts proportionally, and the slower months didn’t create a crisis because the percentages had already done the work when the money was there. Within two quarters he had a clearer picture of his real overhead costs and adjusted his CAPs accordingly.
Where people get it wrong
Some contractors try to set up a flat-dollar retainage reserve: a separate account where they park a fixed amount to cover retainage they haven’t collected yet. That’s not how Profit First for Construction works. Retainage is a receivables timing issue tracked in your AR aging, not a restricted cash account. When retainage is collected, it goes into Income and gets allocated at your normal percentages like any other deposit.
In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.
How do I use my Target Allocation Percentages (TAPs) in estimating and pricing?
The short answer
Your TAPs tell you how much of every revenue dollar needs to flow to each account, so when you’re estimating a job, you work backward from those targets to make sure the price you’re quoting actually leaves enough for OpEx, Owner’s Comp, Profit, and Tax, not just enough to cover the job costs.
Why it’s different in construction
Construction pricing is tricky because the gap between winning a job and collecting the last dollar can stretch months or longer, with retainage, pay app cycles, and change orders all affecting when cash actually lands. Your TAPs are built from your own 12-month revenue and cost history, so they already reflect your trade’s cost structure: lumpy billings, seasonal slowdowns, crew overhead, and all. When you price a job below what your TAPs require, you’re essentially agreeing upfront to fund someone else’s project with your own working capital. Use the estimating process as the moment to test whether a job can actually support your allocation targets before you sign the contract.
From the field
A landscape construction company with about 40 people had been winning plenty of work but couldn’t figure out why cash was always tight by late summer. When we ran their numbers, their CAPs showed that JobEx and OpEx together were consuming well over 100% of revenue on most jobs; they were literally pricing themselves into a loss before the first shovel hit the ground. We built their TAPs from their own 12-month history and then walked through their estimating process job by job. They started testing every bid against those targets before submitting a number, and within two quarters they had declined three jobs that wouldn’t have supported their allocations and repriced two others. By the following spring they had a small but real balance building in Profit for the first time in years.
From the book, Chapter 5, pp. 95 to 96
“So I can use these percentages to help me bid jobs?” Alex asked excitedly as a half-question, half-revelation. “Great insight, Alex,” I said. “If you know what figure to use for JobEx, which represents the cost of the job in terms of cash flow, what happens if you bid lower than that number?” “I’ll have a cash shortfall,” Alex said. […] if you bid at lower percentages than any of these figures, you will come up short on both your profitability and your cash flow. If you want more profit and to take home more money, you may need to increase that bid.”
Where people get it wrong
A common mistake is assuming there’s a standard overhead percentage for your trade that you can plug into every bid. The book is direct on this: overhead is unique to each business, and your TAPs have to come from your own numbers and goals, not from industry tables or what a competitor down the street is rumored to use. Benchmarks feel like a shortcut, but they’ll price you wrong in both directions.
In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.