Billing, WIP and retainage: handling the cash side

Retainage is money you’ve earned but can’t spend yet, and these answers keep it out of your allocations until it lands.

Related topics:Pricing and biddingOwner pay and distributions

Handling retainage in Profit First

How should I handle retainage to avoid an end-of-job cash crunch?

The short answer

Retainage is a timing and working-capital issue: track the outstanding amount on your AR aging report, plan for the cash gap while it sits uncollected, and once it comes in, run it through your normal Profit First allocation like any other deposit. No separate retainage account, no special percentages, no exceptions.

Why it’s different in construction

Landscape construction and most other trades face a real mismatch: job costs, crew payroll, and sub payments come due long before retainage is released, sometimes months later. It’s like buying all the lumber up front on your own dime and waiting months for the reimbursement check: the gap is real, it has to be funded from somewhere, and a line of credit is not the answer. That gap has to be funded from working capital or reserves. If the financing cost of carrying retainage is material, the right place to account for it is in your bid price, not by adjusting your Profit First allocation percentages mid-stream. Billing and collecting aggressively throughout the job shortens the gap and reduces the crunch at the end.

From the field

A landscape construction company with roughly 25 field staff finished a large commercial project and waited nearly four months for retainage release. During that stretch the owner had been mentally treating the retainage as a future bonus and had let reserves drift low. When the check finally arrived, it felt like found money, and most of it went straight to equipment and a crew bonus before any allocation happened. Six months later, a slow winter exposed the gap: no reserves, a thin OpEx account, and a tax bill that hadn’t been set aside. Starting the next season, the owner ran every incoming dollar through allocation first, tracked outstanding retainage on an AR aging report, and built reserves steadily over the following year. The retainage checks stopped feeling like windfalls and started feeling like what they were: delayed income that had already been earned.

Where people get it wrong

A common mistake is setting up a separate retainage bank account or treating collected retainage as restricted cash that bypasses normal allocation. There is no retainage account in Profit First for Construction, and collected retainage is not a windfall to spend freely: it goes into Income and gets allocated at your normal percentages, the same as any other payment.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

How do I handle retainage when a big pay app includes withheld funds?

The short answer

When a pay application withholds retainage, the held amount is not cash you have received: track it as an open receivable in your AR aging, plan for the timing gap in your overall cash management, and when the retainage is eventually collected, deposit it into Income and allocate it at your normal percentages like any other payment.

Why it’s different in construction

On commercial HVAC and mechanical work, retainage on large pay apps can represent a meaningful slice of the contract value, and the release date is often tied to a GC’s schedule rather than your own. A company near 100 employees carrying retainage across multiple active jobs can have a significant portion of earned revenue sitting uncollected for months. Waiting on retainage is like a farmer who has harvested the crop but the grain elevator hasn’t cut the check yet: the work is done, the value is real, but the cash isn’t in hand, and you don’t redesign your whole operation around the elevator’s payment schedule. That timing gap is a working-capital issue to plan around (through pricing, reserves, and cash flow awareness), not something to solve by changing your allocation percentages or opening a special account for it.

From the field

A service and maintenance HVAC company with close to 100 employees was doing a mix of service work and larger commercial installs. On the install side, retainage on several jobs had stacked up over about nine months, and the owner was convinced he needed to set those funds aside in a separate account so he wouldn’t spend them. When the retainage checks finally came in (sometimes $40,000 to $80,000 at a time), he’d been treating them as restricted cash and wasn’t allocating them at all, just parking them. The fix was straightforward: track the open retainage in AR aging so you always know what’s coming and when, and when the check arrives, run it through Income and allocate it the same way you’d allocate any other deposit. Within a quarter, his Tax and Profit accounts started reflecting the full picture of what the business had actually earned.

Where people get it wrong

A common bad move is raising the reserve floor or bumping an allocation percentage specifically because of retainage exposure. Retainage is a timing and working-capital issue, not a reason to change how you allocate. The cost of carrying retainage belongs in your bid price, built into how you price the work in the first place, not in a special account or a modified allocation formula.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

Do I need a separate bank account for retainage?

The short answer

No. Profit First for Construction does not call for a retainage bank account; retainage is a collection-timing and working-capital issue, tracked in your AR aging while it is outstanding and allocated through your normal percentages once it is collected.

Why it’s different in construction

For a specialty sub like a flooring contractor with close to 100 employees, retainage can represent a significant slice of total receivables at any point in the job cycle, sometimes several months of operating expenses sitting uncollected across a dozen projects. That makes it tempting to carve out a special account to “protect” it. Tracking outstanding retainage in a bank account instead of your AR aging is like keeping a tally of who owes you money by moving cash between your own pockets: it doesn’t change what you’re owed or when you’ll collect it, and it just creates confusion when the money finally arrives. The right tool for that visibility is your AR aging report, not a bank account. When retainage checks finally arrive, they go into Income and are allocated exactly like any other payment; there is nothing special about the source that changes how the money is handled.

From the field

The owner of a specialty flooring sub had opened what she called a retainage holding account years before she found Profit First for Construction, reasoning that keeping those funds separate would prevent her from spending money she hadn’t truly earned. The account sat mostly idle, and when large retainage checks arrived she moved them in, then pulled from them whenever cash got tight, treating the balance as a reserve rather than running it through allocation. The result was that Profit, Tax, and Owner’s Comp were chronically underfunded because a meaningful chunk of revenue was bypassing the system entirely. After closing the retainage account and routing every incoming check through Income and normal allocation, her Profit and Tax accounts started building steadily for the first time. She kept a detailed AR aging report to track what was still outstanding, which gave her better visibility into the cash gap than the old account ever had.

Where people get it wrong

A retainage bank account feels like good discipline, but it creates a problem: money sitting in that account tends to get treated as a reserve or a windfall rather than going through normal allocation. Some contractors even raise their Profit or Tax percentage specifically to “capture” retainage when it lands: that’s also wrong. Collected retainage is ordinary income. It goes into Income and gets allocated at your normal percentages, full stop. Track what’s still outstanding in your AR aging; that’s the right tool for the job.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

What happens when owner-held retainage is finally released to me?

The short answer

When retainage is actually collected, it is regular cash income and goes straight into your Income account to be allocated at your normal Profit First percentages: no special treatment, no separate retainage account, and no waiting for a project milestone to move it through the system.

Why it’s different in construction

Retainage can sit locked up for months on a commercial or public job, so when that check finally arrives it can feel like a windfall. It isn’t. Getting that retainage check feels like finding money in an old coat pocket, but it’s actually the last paycheck on a job you already finished: the taxes, remaining costs, and working-capital obligations came with it all along. The timing gap is a cash-flow and bidding issue, not a reason to handle the deposit differently once it’s in your hands.

From the field

A husband-and-wife roofing operation had been setting retainage checks aside in a separate savings account, planning to use the money as a bonus pool once a job closed out. On a string of commercial re-roof contracts, that account grew to nearly $80,000 over about eight months. When a supplier dispute delayed final sign-off on two jobs simultaneously, the couple realized they’d been mentally spending money that still had tax obligations and outstanding material invoices attached to it. After switching to standard Profit First allocation (every dollar in, Income account first, then split to the normal accounts), they stopped treating retainage as a reward and started seeing it as what it was: the tail end of a billing cycle. Their quarterly profit distributions became smaller but reliable, and they stopped the scramble to cover taxes after big closeout months.

From the book, Chapter 14, pp. 208, 210

I had a retainage check come in about a month ago from an old job, and I didn’t know what to do with it all or how to handle it.” […] Now, I get it, but what you need to consider are the consequences of changing allocation percentages arbitrarily or for one large deposit.” […] “I can only give you general advice,” I said, “and the first thing I would tell you is to allocate the money in the usual proportions.

Profit First for Commercial Construction

Where people get it wrong

Some contractors are told to open a dedicated retainage reserve account or to hold retainage funds separately until punch list is complete. Profit First for Construction doesn’t do that. There is no retainage account in the system, and you never change your allocation percentages to account for retainage timing. Track what you’re owed on your AR aging report (that’s the right place for it), and run every dollar you collect through normal allocation when it arrives.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

How does Profit First for Construction handle retainage differently than standard accounting?

The short answer

Profit First for Construction treats retainage as a receivables and working-capital timing issue, not as restricted or specially categorized cash: once it is collected, it goes into your Income account and flows through your normal allocation percentages like any other payment. There is no retainage reserve account, no higher POT target because of retainage, and no exceptions to the allocation process when a retainage check arrives.

Why it’s different in construction

Retainage is the portion of each pay application a project owner withholds until contract conditions are met, which can mean you’ve done the work but won’t see that cash for months. That gap is a real working-capital problem: you’ve already paid your subs, your crew, and your suppliers, but the money is still sitting in the owner’s hands. The right place to track it is your accounts receivable aging, not a separate bank account. The financing gap retainage creates is a bid-pricing and cash-planning issue; it doesn’t change how you allocate money once it actually lands in your account.

From the field

A roofing contractor with about 60 employees was doing a steady mix of commercial re-roofing under contracts that held back retainage for 90 days after completion. Every time a retainage check came in (sometimes $40,000 or $50,000 at a time), the owner treated it as a windfall and moved most of it straight into his operating account to cover whatever felt urgent. By the end of the year he had no Profit account balance and owed a larger-than-expected tax bill. After setting up Profit First for Construction properly, he started running every dollar, including retainage checks, through his Income account and allocating at his normal percentages. The first quarter he did it that way, his Profit account received its first real deposit in three years, about $18,000, and his Tax account had enough to cover the quarterly estimate without a scramble.

Where people get it wrong

Some contractors and even some accountants suggest opening a separate retainage reserve account or setting aside retainage in a kind of escrow until it’s released. Profit First for Construction does not do this: retainage is simply AR you haven’t collected yet, and once you collect it, it allocates the same way every other dollar does. Creating a retainage account adds complexity without improving cash clarity, and it can tempt you to treat that money as off-limits for allocation, which breaks the system.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

What is a retainage aging report and why do I need one?

The short answer

A retainage aging report tracks every retained amount, its release conditions, expected collection date, and any offsetting retainage you owe to subs, giving you a clear picture of working capital that is earned but not yet in hand. It is an AR management tool, not a trigger for Profit distributions or a reason to hold a special reserve account.

Why it’s different in construction

Paving and other heavy-civil contractors can have dozens of open contracts at once, each with different retainage percentages, release conditions, and owner timelines. Without a running aging report, it’s easy to underestimate how much cash is locked up in the receivables column, and equally easy to forget that you owe retainage to your own subs until their release demands arrive. Tracking it on the AR side, not in a separate bank account, keeps your Profit First accounts clean and your working-capital picture accurate.

From the field

A paving contractor with about forty people was consistently surprised when large retainage checks arrived, sometimes spending the money before sub retainage obligations came due a few weeks later. The owner had no systematic way to see what was owed to subs versus what was coming in from owners. After building a simple retainage aging report as part of his AR process, he could see at any given time roughly how much net retainage he expected over the next sixty to ninety days. When checks did arrive, they went into Income and were allocated normally. The sub retainage obligations were already visible in the report, so there were no more surprise shortfalls in JobEx. Cash flow planning became noticeably less stressful within a few months.

Where people get it wrong

Some advisors suggest setting up a dedicated retainage reserve account to hold retained amounts until release. Profit First for Construction doesn’t use one, and you shouldn’t either. Retainage belongs on your AR aging report as a receivable: tracking it there is standard practice. A separate bank account for it doesn’t improve cash clarity; it just adds complexity and can tempt you to treat the balance as off-limits cash that distorts your real account picture.

In the book: Profit First for Commercial Construction, Chapter 10, System Maintenance: Quarterly Reviews and Timely Actions.

How do I know when retainage will be released so I can plan cash flow?

The short answer

Retainage release timing is a working-capital and AR management issue, not a reason to change your Profit First allocation percentages. Track unreleased retainage in your AR aging, and if the financing cost of a long collection delay is meaningful, build that cost into your bid price and contract terms.

Why it’s different in construction

Specialty subs and GCs alike can sit on withheld funds for months after substantial completion, and the gap between finishing the work and collecting that last check is a real cash drain. The right place to account for that drag is in how you price the job, not by adjusting your allocation percentages or setting up a separate retainage account. When the retainage check finally arrives, it goes into Income and is allocated at your normal percentages like any other deposit. Keeping a current AR aging that shows unreleased retainage by job gives you the visibility you need to plan without distorting your Profit First structure.

From the field

A specialty flooring sub with about eight employees finished a commercial tenant build-out and did solid work, but the GC held ten percent retainage for nearly five months after punch list. The owner had been mentally counting that $40,000 as available cash and had already committed to new equipment and a crew bonus. When the check finally came, he spent most of it immediately and skipped allocation entirely, telling himself it was a one-time catch-up. The next quarter he was short on taxes and had nothing in reserves. After implementing Profit First for Construction, he started tracking retainage in his AR aging, priced future jobs to reflect the financing cost of long holdbacks, and ran every incoming check, retainage or otherwise, straight through his normal allocation rhythm. Within two quarters his Tax account was funded and he stopped dreading the end of jobs.

Where people get it wrong

A common mistake is raising the JobEx or POT percentage specifically to create a retainage cushion, or setting up a dedicated retainage reserve account. Neither approach is correct. Retainage is a timing issue on the receivables side; the answer is accurate AR tracking and smarter pricing, not a restructured allocation or a new bank account.

In the book: Profit First for Commercial Construction, Chapter 10, System Maintenance: Quarterly Reviews and Timely Actions.

Customer deposits and change orders

What happens to customer deposits and long-lead material prepays under Profit First for Construction?

The short answer

Customer deposits and long-lead material prepays should be tracked carefully, recorded as liabilities until earned, and kept available for the job obligations they were collected to cover; a separate bank account or sub-account is a practical way to create that behavioral separation, though Profit First for Construction does not require a specific named account or mandate any particular release trigger.

Why it’s different in construction

Deposits are especially common in masonry, millwork, and any trade that orders materials weeks or months before installation. The risk is real: a large deposit lands in the main account on a Tuesday, payroll is due Friday, and by the time the materials vendor wants payment the money is gone. Keeping deposit funds in a separate account, even a simple sub-account at the same bank, creates useful friction and a clear paper trail. It also matters legally: if a job falls through before materials are ordered, that deposit may need to be refunded, and commingling it with operating funds makes that painful. The book notes that how you handle splitting deposits between income and liability depends on your facts and circumstances, so work through the specifics with your accountant.

From the field

Three years into running his masonry business, a contractor landed a $180,000 commercial job and collected a $45,000 deposit to lock in block and brick pricing before the season’s price increases hit. He deposited it in his regular checking account with every intention of calling the supplier that week. Over the next ten days, two payroll runs and a subcontractor invoice consumed most of it. When he finally called the supplier, he was $18,000 short and had to put the balance on a credit line, at a higher price than the deposit was meant to lock in. After working through Profit First for Construction, he opened a simple job deposits account at his existing bank. Every deposit goes there first, and it only moves to JobEx when the purchase order is placed or the obligation is incurred. In the two years since, he hasn’t once been short on a material prepay.

From the book, Chapter 9, p. 154

“Yeah, I had a similar situation,” Paul interjected. “We were working on a government contract, waiting on a specific type of electrical fixture that got held up overseas. The project was delayed by three months, and we were fined heavily for it. Since then, I’ve made sure to negotiate up-front payments specifically to cover any items we anticipate it will take a long time to get so that doesn’t hold up my jobs. […] Now that you have the money in hand, though, how can you keep from spending it if you haven’t started the job yet? Also, you may very well have legal liability to refund that money if the job doesn’t go forward.”

Profit First for Commercial Construction

Where people get it wrong

Some contractors treat a job deposits account as an escrow account: a legally restricted, separately titled fund with formal release conditions. That framing creates unnecessary complexity and isn’t what Profit First for Construction calls for. The purpose of a separate account is behavioral clarity and traceability, not legal restriction. What matters is that the funds stay available for the job obligation they were collected to cover, that the liability is recorded properly in your books, and that the money isn’t casually consumed by payroll or overhead before the obligation is met.

In the book: Profit First for Commercial Construction, Chapter 9, Creating Clarity: Considering Your Banking Needs.

How should I handle deposits, long-lead material money, and unapproved change orders?

The short answer

Customer deposits and long-lead material money should be tracked carefully, ideally in a separate Job Deposits account, so they aren’t accidentally spent before the work is earned; unapproved change orders should be tracked separately and never treated as funded until the owner signs off.

Why it’s different in construction

Construction is one of the few industries where owners routinely send large checks before a single shovel hits the ground, and that money often carries legal liability to refund if the job doesn’t proceed. Long-lead material purchases (HVAC equipment, specialty pipe, engineered steel) can require six-figure deposits months before installation, making it easy to raid that cash for day-to-day costs on other jobs. Unapproved change orders are especially risky: the work may already be done, but the money isn’t real until the owner approves and pays, so booking it as available cash is a fast way to create a shortfall.

From the field

A plumbing contractor with about 15 employees landed a large commercial tenant-improvement job that required a $90,000 deposit to lock in fixture lead times. The owner deposited the check into the main operating account and, over the next six weeks, gradually used it to cover payroll and supplier invoices on other jobs. When the fixtures arrived, the $90,000 was gone and the owner had to scramble for a line of credit to pay the supplier. After setting up a dedicated Job Deposits account, every upfront payment went there first and stayed there until it was legitimately earned and ready to allocate. The owner also started logging unapproved change orders in a separate tracking sheet rather than mentally counting them as income. Within two billing cycles the cash-flow anxiety around material buys had nearly disappeared.

From the book, Chapter 9, p. 153

“What about job deposits?” I asked. “Do you ever get money for a job up front? What about mobilization money?” “Yeah,” Alex said. “We all need it.” “But do you ever borrow from that money to pay for other things?” I asked. “We sometimes have to. We all do,” Alex said. The contractors looked around at each other as if he had revealed a shared secret. […] Even though things have improved, contractors learned to pay early for things that take a long time to get, like special order items or supplies that must be shipped. Delays like that can cause liquidated damages or late penalties and wreck an otherwise profitable job.”

Profit First for Commercial Construction

Where people get it wrong

Some contractors treat a job deposit account like an escrow account (a legally restricted, separately administered fund) and get tangled up in compliance questions that don’t apply. A Job Deposits account in Profit First for Construction is simply a practical cash-clarity tool: it keeps advance payments visible and separate so you don’t spend them before they’re earned. It isn’t escrow, it isn’t legally restricted (unless your contract or state law says otherwise), and it doesn’t change how you allocate dollars once the money is genuinely earned.

In the book: Profit First for Commercial Construction, Chapter 9, Creating Clarity: Considering Your Banking Needs.

Underbilling and pay app timing

What is an underbilling crunch and why does it happen to commercial contractors?

The short answer

An underbilling crunch happens when your crew and subs are spending cash on a job faster than your pay applications are being submitted, approved, and collected: your bank account drains on schedule while revenue lags weeks or months behind, and traditional accounting often hides the gap until it becomes a crisis.

Why it’s different in construction

Commercial drywall, framing, and other trade subs are especially exposed because they carry large payrolls and material costs on monthly or semi-monthly pay app cycles while GC approval and payment can add another 30 to 60 days. A 60-employee framing crew burns through payroll every two weeks regardless of when the check arrives. Retainage held back on each pay app compounds the problem: you’re funding all of the work but collecting only a portion of what’s billed. The gap between work-in-place and cash-in-hand can quietly grow to several months of operating costs before anyone notices on a standard P&L.

From the field

A commercial drywall sub with about 60 employees landed a large tenant-improvement project and staffed up accordingly. Three months in, the GC’s approval cycle stretched from 30 days to nearly 50, and two pay apps were disputed and held. The sub’s JobEx account started running short first (materials and sub-tier vendors were due), then the payroll account showed strain. The owner had been watching the bank balance and thought things looked manageable, but the balance reflected collected cash, not the $190,000 sitting in unapproved billings. After restructuring around Profit First for Construction, they began tracking the gap between submitted and collected billings as a standing agenda item at their weekly cash review. When the JobEx account signaled tightness, they had two to three weeks of warning instead of two to three days.

From the book, Chapter 12, p. 188

“Last month was rough,” Mark said. “We kept our crews busy trying to catch up, but cash didn’t come in because of low pay apps from the month before. We still had to pay that labor.” “Yeah, and we got hit with that workers’ comp renewal we talked about last time,” Alex added. “More money out of pocket that we hadn’t planned on. We’ll be prepared for it next year, but that doesn’t help us with the last few weeks.”

Profit First for Commercial Construction

Where people get it wrong

A common assumption is that a healthy backlog or a signed contract means cash is coming. It isn’t: cash comes when it’s billed, approved, and collected, and in commercial construction those three steps can span 60 to 90 days or more. Contractors who manage by bank balance alone mistake a full pipeline for a full account and get blindsided when field costs outrun collections.