Cash flow management for construction companies

Your bank accounts show where the cash went and where it’s headed, and these answers help you read them.

Related topics:Seasonality, slow months, and curveballsAllocation rhythm and mechanics

When JobEx cash runs tight

How should I manage JobEx when WIP, retainage, and draw timing are lumpy?

The short answer

Keep your allocation percentages stable through the quarter and use your WIP schedule, AR aging, upcoming job commitments, and expected collections to plan when cash will arrive and what obligations are coming: retainage timing is a working-capital and billing problem, not a reason to change your targets.

Why it’s different in construction

Low-voltage and security work, like most construction, bills on progress draws that don’t land evenly across the calendar. A draw that was supposed to hit on the 15th might not clear until the 28th, like a check you know is coming but can’t spend yet, and retainage sits on the receivables side for months. That lumpiness can make JobEx look short in week two of a month even when the job is on track and the money is genuinely coming. The answer is to stay on top of your AR aging and collections, negotiate vendor terms where you can, and use reserves to bridge the gap, not to adjust percentages mid-quarter or release Profit early because a big check arrived.

From the field

A husband-and-wife low-voltage and security shop was doing solid work but living in a constant state of cash anxiety. They had three jobs in progress at any given time, retainage on all of them, and draws that came in two to six weeks later than expected. Their habit was to raid whatever account had a balance when a sub needed to be paid, then try to sort it out later. After setting up Profit First for Construction, they built a simple one-page cash-flow look-ahead each month (just expected draws, known payables, and retainage release dates) and kept a small reserve in the Vault to cover the gaps. Within about four months, the scrambling stopped. The allocation percentages stayed the same; what changed was that they could see the lumps coming far enough ahead to manage them.

From the book, Chapter 14, p. 209

“I did the same thing,” he said, “and paid off a lot of my debt. I’m working toward that healthy business Wade was talking about.” “Peter, did you check to make sure there weren’t other things that needed paying?” I asked. “I guess I should have thought about that more,” Peter admitted. “Two days later an invoice from a materials supplier showed up that I forgot about. I ran short and had to send a partial payment. I told them I would cover it with my next draw.”

Profit First for Commercial Construction

Where people get it wrong

One piece of bad advice that floats around is to raise your JobEx percentage or set aside a special retainage reserve to account for the cash tied up in retainage. That approach doesn’t solve the timing problem: it just distorts your allocations and can mask whether you’re actually pricing jobs correctly. Retainage is a receivables issue. Track it on your AR aging, price your work to account for the carrying cost, and manage the timing through collections and reserves, not by changing your percentages.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

Can I use JobEx as my general overhead account if cash is tight?

The short answer

JobEx is only for costs that go away when the job goes away (materials, subs, job-specific rentals, bonds, and permits), so using it as a general overhead account corrupts your margin signals and leaves you blind to real cost problems.

Why it’s different in construction

Steel erection and other specialty trades often have tight cash windows between pay apps, and the temptation to pull overhead costs into JobEx when OpEx runs low is real. But the moment you start running office payroll, insurance, or equipment notes through JobEx, you lose the ability to see whether your bids are covering job costs at all. JobEx is designed to be a real-time signal: if it’s running thin, your job margins or billing timing need attention. Mixing overhead into it kills that signal entirely.

From the field

A steel erection sub with about 25 field staff hit a rough patch mid-year when two pay apps came in late and OpEx looked dangerously low. The owner started routing a few overhead items (fuel for the company truck, a software subscription, part of the office manager’s pay) through JobEx just to keep OpEx from hitting zero. It felt like a fix, but over the next two months his JobEx percentage looked healthy on paper while his actual job margins were eroding. When he finally rebuilt the accounts properly and ran his CAPs, he discovered his real OpEx need was about $8,000 a month higher than his allocation reflected. The answer wasn’t to raid JobEx; it was to raise prices on the next two bids and trim two nonessential overhead items he’d never scrutinized.

From the book, Chapter 4, p. 83

“Peter, don’t you want to make sure that RGC doesn’t rob you to pay Paul?” “That was pretty bad,” Peter said, laughing, “but yeah, I need to get paid on time. I’ve got to pay my guys, but materials are big too. Of course, I need to have both to get a plumbing job out the door. There usually isn’t much left over.” […] We have to allocate some of our income to a separate account to cover JobEx. The money you pay out in cash for expenses is really someone else’s money and not yours to spend. Otherwise, you have no idea whether you have that money to spend.”

Profit First for Commercial Construction

Where people get it wrong

Some contractors think of JobEx as a flexible pool they can dip into whenever another account runs short. That’s exactly backwards. JobEx exists to protect job obligations (subs, materials, bonds), and borrowing from it for overhead means you may not have the cash to pay a subcontractor when their invoice lands. If OpEx is chronically short, the fix is adjusting your allocation percentages or your pricing, not raiding JobEx.

In the book: Profit First for Commercial Construction, Chapter 4, Mastering JobEx: Core Insights for Financial Control.

If too much revenue is being consumed by JobEx and OpEx, what are my main levers?

The short answer

When JobEx and OpEx together are eating most of your revenue, your main levers are improving job-level efficiency and purchasing, right-sizing overhead, and raising prices, and if the economics still don’t work, being more selective about which jobs you take.

Why it’s different in construction

In construction, JobEx is often the dominant cost, so small gains in purchasing, subcontractor management, scheduling, and change-order control can move the needle faster than cutting overhead. Lumpy pay apps and retainage timing can make the problem look worse than it is on any given month, but the real test is whether your CAPs, built from your own 12-month numbers, show a structural shortfall. If JobEx and OpEx together add up to more than all of your revenue, the book is direct: you can’t allocate more than you bring in, and the fix is raising prices, cutting costs, getting more efficient, or some combination of those.

From the field

A landscape construction company with about 15 employees had been busy for two years straight but couldn’t figure out why the owner was always scrambling for cash. When we built out their CAPs, JobEx and OpEx together came to about 103% of revenue; they were literally losing ground on every dollar that came in. The owner had been assuming that more volume would solve it. Instead, we worked through three things: tightening material purchasing by consolidating suppliers, dropping two low-margin maintenance contracts that were dragging the average down, and raising prices on new bids by roughly 8%. Within two quarters, Residual Revenue had opened up enough room to fund Profit and Owner’s Comp at meaningful percentages for the first time. The owner said it was the first time in years he felt like the business was working for him instead of the other way around.

From the book, Chapter 6, p. 109

“So you are basically saying that I need to fire my administrative people and drastically cut expenses?” Mark asked. […] I want to caution you against cutting the muscle out of your company’s operations. We are looking to cut the fat, but that’s not just about cutting expenses. It’s tough and sometimes impossible to cut your way to profitability.” […] add the right revenue to your top line: profitable revenue,” I said. “That is one way. It is true that if you spread your operating expenses over a larger income base, you can cover more, but only if you don’t expand your overhead expenses at the same time.

Profit First for Commercial Construction

Where people get it wrong

A common mistake is chasing revenue growth as the fix (working more hours, taking more jobs) without addressing the underlying percentages. More volume at a bad margin just produces more chaos: you end up with the same thin slice of what’s left, only now you’re busier and more stretched to get it.

In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.

What does it mean when JobEx is strained while Income is high from a big pay app?

The short answer

When a large pay app lands in Income but JobEx still feels tight, the cash-management signal is telling you that job obligations may be outpacing what the allocation is covering, but a high bank balance alone does not prove underbilling or any single cause. You need to compare WIP, committed costs, billing, AR aging, and field progress to find out whether the issue is a timing gap, a cost overrun, scope creep, or a billing lag, and then fix the operational root cause rather than adjusting allocation percentages mid-quarter.

Why it’s different in construction

Steel erection and other specialty trades often bill in large, lumpy pay apps that can make the Income account look flush for a week or two while subs, material deliveries, and crew payroll are already queued up against that same money. The JobEx account is a real-time cash-flow tool, not a project-margin report: it shows cash pressure, but it doesn’t explain why the pressure exists. That diagnosis requires your job-cost records, commitment logs, and WIP schedule working together with the bank picture. A pay app that covers work already performed but not yet billed will relieve the strain; a cost overrun won’t, no matter how big the check.

From the field

A steel erection sub with about 25 field staff landed a $420,000 pay app and assumed the cash crunch was over. Within ten days, JobEx was strained again and the owner couldn’t figure out why. Pulling the job-cost report alongside the WIP schedule revealed two problems: a detailing sub had been paid ahead of schedule, and a material delivery for the next phase had arrived early and needed to be paid. Neither was a billing problem; both were timing issues. The owner covered the gap from reserves, finished the quarter without touching allocation percentages, and added a simple two-week commitment review to the monthly rhythm so future cash needs were visible before they became emergencies.

In the book: Profit First for Commercial Construction, Chapter 13, Building Resilience: Cash Flow Management in Uncertain Times.

How do I keep from raiding owner pay or overhead to fund mobilization at the start of a job?

The short answer

Keeping mobilization costs from raiding Owner’s Comp or OpEx starts with pricing work so that the JobEx allocation genuinely covers early job costs, and building a reserve over time so working-capital gaps don’t force you to rob other accounts. Profit First for Construction doesn’t prescribe a universal reserve target, but consistently building a buffer, even a modest one, gives you options when costs run ahead of collections.

Why it’s different in construction

Mobilization is a front-loaded cash event: equipment moves, permits get pulled, materials get ordered, and crews show up before the first pay app is approved and paid. Mobilization is front-loaded the same way a restaurant has to buy all the groceries before it serves a single plate, except in construction, the “meal” might not get paid for another sixty days. A commercial painting contractor on a large institutional job might be $80,000 into labor and materials before seeing a dime from the owner. If the JobEx allocation isn’t sized to that reality, or if there’s no reserve to bridge the gap, the money has to come from somewhere, and it usually comes from the accounts that were supposed to pay overhead and the owner’s salary. The fix starts at the bid, not at the bank.

From the field

A second-generation commercial painting contractor had been in business for over 20 years but still paid himself inconsistently. Every time a large job kicked off, mobilization costs (crew wages, primer, lift rentals) hit before the first progress payment arrived, and the owner would quietly skip his own paycheck to keep the job moving. After working through his CAPs, he realized his JobEx percentage was too low for the type of work he was bidding, and he had no reserve to bridge the timing gap. He adjusted his pricing on new bids, started building a buffer from retained quarterly profit, and committed to taking Owner’s Comp on schedule regardless of where the job stood. Within about six months, he hadn’t missed a paycheck, and the business had roughly $40,000 sitting in a Vault account for the next mobilization crunch.

From the book, Chapter 6, p. 108

“What if we run short?” Mark asked. “You will run short,” I said, pausing for effect. “At first, you probably will. But you will start to see what you have in each account to spend. You may naturally start to make cuts and adjustments because of that. Ideally, you won’t borrow from one account to pay another. Let’s be straight, it may very well happen as you get started. The goal is to not get in the habit of doing it. If you do, at least you’ll be aware of it and can start taking a hard look at what you are spending money on and making some changes.”

Profit First for Commercial Construction

Where people get it wrong

A common piece of advice is to use retainage releases or extra cash flow to fund mobilization reserves. That approach is unreliable because retainage arrives late and unpredictably, and “extra cash flow” is rarely extra. It usually has somewhere else to go. Reserves should be built steadily from the profit retained at each quarterly split, not counted on from project windfalls.

In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.

How do I align JobEx payments to vendor terms without running out of cash?

The short answer

Aligning JobEx payments to vendor terms means knowing each key vendor’s due dates before you bid the job, allocating to JobEx on a schedule that puts the cash there before those dates arrive, and building any timing gap into your bid margin rather than hoping the money shows up in time.

Why it’s different in construction

Construction cash flow is inherently lumpy: a pay app may not hit your account until 30 or 45 days after you submit it, but your material supplier wants payment in 30 days from delivery and your sub wants a check two weeks after that. A design-build GC running multiple trades at once faces this on every project simultaneously. Mapping each vendor’s terms to your expected billing dates, before the job starts, turns a reactive scramble into a predictable schedule. If a vendor’s terms genuinely don’t match your job’s cash cycle, that’s a negotiation conversation or a margin conversation, not a reason to raid OpEx or put materials on a line of credit.

From the field

A second-generation design-build GC had been running the business the same way his father did: pay whoever called loudest, float the rest on a credit line, and sort it out at year-end. By the time he came in for help, the line of credit was nearly maxed and he couldn’t tell which jobs were actually profitable. We mapped out the payment terms for his top eight vendors and three regular subs, then set a biweekly JobEx allocation timed to his pay app submissions. Within about three months, the frantic vendor calls stopped. Within six months, he’d paid down roughly $30,000 of the credit line because he was no longer using it to bridge predictable gaps he could have planned for. The discipline wasn’t complicated. It was just consistent.

From the book, Chapter 10, pp. 161 to 162

“Do your materials suppliers also show up at your door to collect checks?” “No,” Dan replied, “not usually, anyway. I pay them every thirty or forty-five days, or whatever terms I work out with them, but they will cut me off if they don’t get paid.” […] “The point of all this is to set a rhythm,” I said. “There will be exceptions, but they should be rare. You need to set clear expectations for when invoices are due and when subs get paid.

Profit First for Commercial Construction

Where people get it wrong

Some contractors try to solve vendor-timing problems by drawing on a line of credit as a standing bridge. Relying on it as a standing bridge is like keeping a fire extinguisher in the truck but recharging it every week because you keep pulling it for non-emergencies. Eventually it won’t be there when the real fire starts. That works once or twice, but it becomes a crutch that masks the real issue: the bid didn’t account for the cash-timing gap. A line of credit is for short, genuine timing emergencies, not a chronic substitute for planning. Using it as an operating account quietly adds interest cost to every job and makes it nearly impossible to see your true margins.

In the book: Profit First for Commercial Construction, Chapter 10, System Maintenance: Quarterly Reviews and Timely Actions.

When JobEx is draining but A/R is thin, what’s happening and how do I fix it?

The short answer

JobEx draining while A/R is thin usually points to a billing lag, cost overruns, scope creep, or front-loaded job costs. Diagnose the cause using your WIP schedule, job cost detail, billing log, and collections status, then fix the root problem rather than adjusting allocation percentages mid-quarter.

Why it’s different in construction

In site work and excavation, costs hit early (equipment rentals, fuel, materials, and crew wages) while pay apps often lag two to four weeks behind the work. That gap means JobEx can bleed out before the Income account refills it. Scope creep on earthwork jobs is especially common because changed conditions underground are hard to price in advance; if you’re not documenting and billing change orders promptly, you’re funding the owner’s surprises out of your own cash. Retainage held on prior draws compounds the problem by shrinking the A/R that would otherwise be converting to cash.

From the field

A site work and excavation contractor with nearly 100 employees kept watching the JobEx account drop to near zero by the third week of every month, even on jobs that looked profitable on paper. After pulling the WIP schedule alongside the job cost detail, it became clear that two large jobs were being billed on a fixed monthly schedule while costs were front-loaded in the first half of each phase. The billing rhythm didn’t match the spending rhythm. On top of that, three change orders totaling roughly $180,000 had been completed but not yet submitted for approval, so that work was fully funded out of JobEx with nothing coming back in. The contractor tightened the billing process to submit change orders within five business days of completion and shifted pay-app submissions to align with actual cost milestones. Within about two months, the JobEx account stabilized and the chronic end-of-month scramble stopped.

From the book, Chapter 4, p. 77

“I’ve been at this a long time, and I’ve seen more businesses die from cash flow problems than bad work. We all know how this goes—you’re running a job covering payroll and let’s not forget equipment rentals, and the client hasn’t paid for the last two draws.”

Profit First for Commercial Construction

Where people get it wrong

A common reaction is to raise the JobEx allocation percentage mid-quarter to give the account more room. That doesn’t fix a billing or cost problem. It just shuffles cash away from Owner’s Comp or Profit without solving anything. Percentage changes belong at the quarterly review, after you’ve confirmed whether the issue is a one-time timing gap or a real structural problem.

In the book: Profit First for Commercial Construction, Chapter 4, Mastering JobEx: Core Insights for Financial Control.

Can I allocate money to Profit if my JobEx account is short on cash?

The short answer

Yes. Profit First allocations are intentional and run every cycle, but a JobEx shortage is a signal you need to investigate right away, not a reason to automatically reverse your percentages.

Why it’s different in construction

Construction cash flow is lumpy by nature: pay apps come in batches, subs need to be paid before the next draw arrives, and a single slow owner payment can leave JobEx looking short even when billing is current. Before you conclude something is structurally wrong, check whether you’re looking at a timing gap between what you’ve billed and what’s been collected, a cost overrun on a specific job, or an allocation step that was too aggressive given your current revenue pace. A short JobEx balance for one or two weeks is often a timing issue, not a systemic problem, and the fix is different in each case.

From the field

A roofing contractor with close to 100 employees had grown fast and was running three large commercial jobs simultaneously. Every time a pay app was delayed, the owner would immediately pull back from Profit and Owner’s Comp to shore up JobEx, sometimes doing it two or three times in a single quarter. After working through Profit First for Construction, he stopped treating each short week as a system failure. He built a small Vault reserve to cover timing gaps, committed to investigating the root cause before touching allocations, and held percentage changes for the quarterly review. Within two quarters he had a clearer picture of his actual margins and stopped the cycle of robbing Profit every time a check was slow.

From the book, Chapter 12, pp. 191 to 192

“When you borrow from one account to shore up another, it’s easy to justify and forget. You shouldn’t have to take it from your own pocket either; you feel the pain there too. The key is, if we keep borrowing from ourselves or our Profit and Tax accounts, that cash profit we were working toward disappears just as magically as it did before we tried this.” […] Sometimes, I purposely allocate an extra percentage point to JobEx at the start to build a buffer and break the cycle of borrowing from the next job.”

Profit First for Commercial Construction

Where people get it wrong

A common reaction is to simply stop allocating to Profit whenever JobEx feels tight, treating Profit as optional until the job accounts look comfortable. That thinking guarantees you’ll never consistently take profit, because in construction there’s almost always some account that feels tight. The system works precisely because Profit gets allocated first, alongside every other account; the shortage in JobEx is the signal to fix pricing, billing speed, or cost control, not a reason to suspend the allocation.

In the book: Profit First for Commercial Construction, Chapter 12, Managing Curveballs: Navigating Cash Flow Disruptions.

My JobEx bucket is draining faster than my Income deposits are growing. What does that mean?

The short answer

When JobEx drains faster than Income deposits grow, the most common causes are under-billing, slow collections, or costs running ahead of your billing cycle, and the fix starts with your WIP schedule and AR aging, not with cutting job costs.

Why it’s different in construction

In landscape construction and similar contractor businesses, costs often hit early in a project phase (crew hours, materials, sub invoices) while the pay app or draw request follows weeks later. If you’re billing monthly but paying subs and crew weekly, the JobEx account will feel the pressure before Income catches up. Retainage makes this worse: even when a pay app is approved and collected, a slice of it never arrives until the job closes out. The gap between spending and collecting is structural in construction, which is exactly why tracking the JobEx balance as a real-time signal matters so much.

From the field

About two years into running a 40-person landscape construction company, the owner noticed that the JobEx account was consistently low by the third week of every month, even on months when revenue looked strong. Pulling the AR aging showed that two large commercial clients were paying 60 to 75 days after invoice, well outside the 30-day terms in the contracts. Meanwhile, crew payroll and material deliveries were going out every week. The total gap between costs incurred and cash collected was running close to $220,000 at any given time. The owner started sending pay apps five days earlier each month and assigned someone to follow up on approvals within a week. Within three months the average collection time dropped to around 40 days and the JobEx account stopped bottoming out before month-end.

From the book, Chapter 14, p. 213

“If your sales have doubled, have your accounts receivable doubled too?” I asked. “Yes, come to think of it, they at least doubled,” Kevin responded. “How did you know?” “I bet your payables doubled, too, correct? How about overall debt?” I asked.

Profit First for Commercial Construction

Where people get it wrong

It’s easy to look at a draining JobEx account and assume there’s a cost overrun somewhere. That may be true, but under-billing and slow collections are at least as common a cause, and they’re invisible if you only look at job-cost reports. Before you cut crew hours or defer material orders, check your WIP schedule for costs running ahead of billed value, and check your AR aging for invoices sitting past terms. Cutting costs on a healthy job because of a billing lag just creates new problems.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

Overhead that grows too fast

How does Profit First for Construction expose hidden overhead waste?

The short answer

Profit First for Construction exposes overhead waste by separating JobEx and OpEx into distinct bank accounts, so the ongoing cost of running your business becomes impossible to ignore, but a shortfall in OpEx is a signal worth diagnosing, not an automatic verdict, because pricing gaps, job overruns, slow collections, and rapid growth can all produce the same symptom.

Why it’s different in construction

Paving, framing, mechanical, and other trade contractors often carry heavy equipment costs, seasonal payroll swings, and large subcontractor flows that can mask overhead creep for years. When every dollar runs through one operating account, a bad month on a big job looks identical to a month where your office overhead quietly crept up. Separating the accounts means your OpEx account tells you one story and your JobEx account tells you another, and you can act on the right one.

From the field

A paving contractor with about 15 employees had been profitable on paper for three straight years, but the owner was always scrambling for cash by October. After setting up Profit First for Construction accounts, he noticed his OpEx account was consistently running thin in the second half of the year even on strong revenue months. Digging in, he found two culprits: equipment insurance renewals bunched in the fall, and a shop lease step-up he had forgotten about. Neither showed up as a line-item problem on his P&L because they were absorbed into a single overhead pool. Moving those into a Drip account funded from OpEx smoothed the drain, and he stopped raiding his Profit account every autumn.

From the book, Chapter 15, p. 224

“It has forced me to make some tough choices,” Roger said. “For instance, I saw that we needed to cut overhead, including letting go of a particular truck.” Dan was sitting right by him. I was afraid of what was to come, but asked anyway, “Dan?” “I admit it,” Dan replied, “that truck was a dumb purchase. As much as I wanted to resist your system, I see how controlled this job is. I guess I still have some things to learn.”

Profit First for Commercial Construction

In the book: Profit First for Commercial Construction, Chapter 13, Building Resilience: Cash Flow Management in Uncertain Times.

How do I know if my overhead is growing too fast for my profit margin?

The short answer

Your Current Allocation Percentages (CAPs) tell the story: if revenue is climbing but the share left for Profit, Owner’s Comp, and Tax is flat or shrinking, your overhead is outpacing your margin. That’s a textbook case of the Construction Growth/Profit Paradox.

Why it’s different in construction

A general contractor near 100 employees faces overhead that can balloon fast: project managers, estimators, office staff, software, insurance, and facility costs all tend to grow in steps, not smoothly with revenue. The book puts it plainly: as a construction company grows, overhead tends to grow at a faster rate unless you put guardrails around it. Pay apps and retainage timing can mask the problem for months, making revenue look healthy in the bank while the underlying margin is quietly shrinking.

From the field

Over about 18 months, a general contractor grew from roughly $8 million to $14 million in revenue by adding two project managers, a full-time estimator, and a larger office. The owner assumed bigger volume meant bigger profit. When he finally calculated his CAPs, he found that his OpEx percentage had crept up significantly while his combined Profit, Owner’s Comp, and Tax share had dropped; he was working harder and keeping less. He went line by line through overhead, cut two software subscriptions and a vehicle lease that weren’t earning their keep, raised his markup on the next round of bids, and started declining jobs with thin margins. Within two quarters his POT share was moving in the right direction again.

From the book, Chapter 14, pp. 214 to 215

“When a construction company grows, it is actually very common for its overhead to grow at a faster rate than its top line.” […] “If your percentages are dialed in, you are in growth mode, and all of a sudden you find yourself with a cash deficit from out-of-the-ordinary expenses, you might be overextending yourself and you will have to make some decisions.”

Profit First for Commercial Construction

Where people get it wrong

A common trap is assuming that rising revenue automatically means rising profit, so overhead growth feels acceptable as long as the top line is up. It isn’t. The Construction Growth/Profit Paradox is real: costs tied to growth (hiring, space, equipment, receivables) often outrun the revenue they’re supposed to support. Watching your CAPs regularly is the only way to catch this before it becomes a cash crisis.

In the book: Profit First for Commercial Construction, Chapter 5, Overhead Uncovered: A Cash Flow Perspective.

What if Owner’s Compensation and taxes are funded but OpEx is short?

The short answer

An OpEx shortfall when Owner’s Compensation and Tax are funded is a signal to diagnose the real problem (pricing, overhead, billing gaps, collections, or growth outpacing cash) before doing anything else. Cover the gap from reserves first, then trace the root cause and fix it at the quarterly review.

Why it’s different in construction

In construction, OpEx shortfalls often hide behind lumpy billing cycles. A paving contractor with 60 employees may have a strong pay app in the pipeline but nothing collected yet, so OpEx looks thin even though jobs are profitable. Slow collections, a gap between mobilization costs and the first draw, or rapid crew expansion can all drain OpEx faster than revenue comes in. The fix is usually in billing speed, pricing, or overhead discipline, not in reshuffling allocations mid-quarter.

From the field

A paving contractor with about 60 employees had been running two large municipal jobs simultaneously. Owner’s Compensation and Tax were funded right on schedule, but OpEx kept coming up $15,000 to $20,000 short every allocation cycle. The owner’s first instinct was to pull from JobEx to cover office payroll and insurance. After a closer look, the real problem was a combination of underpriced overhead in the bids and a collections lag of nearly 45 days on progress billings. Rather than raiding JobEx, the owner covered the immediate gap from the Vault, then spent the next quarter tightening billing turnaround and repricing overhead into new bids. Within two quarters, OpEx was consistently funded without borrowing from anywhere.

From the book, Chapter 12, p. 192

Before you do anything else, pause and evaluate the situation. Ask yourself: Is this a one-time expense or something that could recur in the future? Is it something we can plan for? Anticipating these issues is half the battle.” […] If we protect our Profit, Owner’s Comp, and Tax accounts first, we’re in a much stronger position. It’s about strategy, not just surviving from day to day.”

Profit First for Commercial Construction

Where people get it wrong

A common mistake is treating an OpEx shortfall as a reason to immediately raise the OpEx allocation percentage or cut the Owner’s Compensation percentage mid-quarter. That just moves the problem around without fixing it. The right move is to cover the gap from reserves, finish the quarter, then diagnose whether the shortfall is a one-time timing issue or a systemic pricing and overhead problem, and address it at the quarterly review.

In the book: Profit First for Commercial Construction, Chapter 12, Managing Curveballs: Navigating Cash Flow Disruptions.

What signals should I watch in my OpEx account to know if overhead is too high?

The short answer

Watch whether your OpEx account consistently runs dry before the next allocation cycle, and compare what you’re actually spending on overhead against what your pricing and margins can support. If the pressure is persistent, it’s a signal to cut costs, raise prices, or shift to more profitable work.

Why it’s different in construction

Construction overhead is easy to underestimate because it includes cash outflows that don’t always show up cleanly on a profit and loss statement: equipment notes, insurance renewals, and seasonal staffing all hit the OpEx account at irregular intervals. A masonry or concrete contractor with 40 people may carry significant indirect labor and yard costs that look fine on paper but quietly drain OpEx between pay apps. When billing is lumpy and collections lag, the OpEx account can look short even when the underlying overhead level is reasonable, so it’s worth separating a timing problem from a true overhead problem before making cuts.

From the field

A masonry contractor with about 40 people had been growing steadily for three years, adding a project coordinator, a second estimator, and a larger yard. Revenue was up, but the OpEx account kept running short in the last week of every allocation cycle. When we mapped out every cash outflow that wasn’t tied to a specific job, the overhead number was about 30 percent higher than it had been two years earlier, and pricing hadn’t moved to match. The owner had assumed growth would absorb the extra overhead automatically. We worked through the numbers, identified two recurring costs that weren’t earning their keep, and adjusted pricing on new bids to reflect actual overhead. Within two quarters the OpEx account was holding through the full cycle, and the owner stopped borrowing from reserves to cover routine bills.

From the book, Chapter 14, p. 216

“Go back and look at your OpEx allocation percentage,” I said. “If it isn’t keeping up, you may need to cut some overhead, raise your prices, find more profitable jobs, or use some combination of these approaches. That should give you a starting point.”

Profit First for Commercial Construction

Where people get it wrong

A common mistake is treating a few weeks of OpEx tightness as proof that overhead is too high and immediately cutting staff or services. Short runs of pressure often reflect a billing or collection timing gap, not a structural overhead problem. Check your seasonal pattern and cover the gap from reserves before making any permanent changes to your cost structure or allocation percentages.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

How do I prevent my team from spending past the OpEx limit when cash pressure hits?

The short answer

Preventing OpEx overruns under pressure comes down to making the budget visible, assigning clear approval authority, and reviewing upcoming commitments regularly. The Profit First for Construction account structure gives you early warning signals, but it only works if your team knows the rules and you address the root cause when an exception happens.

Why it’s different in construction

A steel erection sub running close to 100 employees has payroll, equipment costs, and subcontractor obligations hitting simultaneously, often on different schedules than pay apps arrive. That gap is where OpEx overruns happen. Someone approves a purchase because the job needs it, not because the OpEx account has room. Keeping Profit and Tax at a separate bank removes the temptation to raid those accounts quietly. An optional Payroll account adds another layer of visibility: if payroll funding is building, you have breathing room; if it isn’t, you know before payday, not after.

From the field

A steel erection subcontractor with just under 100 employees had a project manager who was approving vendor invoices and small equipment rentals without checking account balances. He assumed the owner was watching the money. During a stretch when two large pay apps were delayed by about six weeks, OpEx ran dry and the company quietly started covering overhead from whatever account had cash, including funds that had been allocated to Profit and Tax. By the time the owner noticed, there was a $40,000 hole across those two accounts. After implementing Profit First for Construction, the owner set a simple rule: any unbudgeted OpEx commitment over $2,500 needed a quick check of the OpEx balance before approval. The project manager got a weekly account summary. Within one quarter, the overruns stopped, not because the system was foolproof, but because the team finally had numbers they could see.

Where people get it wrong

A common bad habit is treating the JobEx account as a backup when OpEx runs short, on the logic that ‘the job is paying for it anyway.’ JobEx money exists for job obligations, materials, subs, bonds, job-specific rentals. Using it to cover overhead creates a shortfall on the job side that has to be made up later, and it masks the real problem: OpEx is either underfunded or overspent. Fix the percentage or the spending; don’t borrow from the wrong bucket.

In the book: Profit First for Commercial Construction, Chapter 13, Building Resilience: Cash Flow Management in Uncertain Times.

What should a practical OpEx spending policy include?

The short answer

A practical OpEx spending policy for a construction company should clarify the difference between JobEx and OpEx, set approval responsibilities, establish your allocation rhythm, cover credit-card reconciliation, and document how significant exceptions are handled. Monthly spending reviews help you monitor cash without triggering mid-quarter percentage changes.

Why it’s different in construction

At close to 100 employees, the line between job costs and overhead gets blurry fast: field supervisors, equipment coordinators, and project managers all touch spending decisions. A written policy keeps everyone clear on what comes out of JobEx versus OpEx so allocations stay honest. Payroll timing, pay-app cycles, and seasonal swings in workload all create pressure to spend ahead of cash, which is exactly when a documented approval process earns its keep.

From the field

An electrical contractor with roughly 90 employees had grown fast enough that three different people were approving purchases with no shared understanding of which account the cost belonged to. Equipment rentals for specific jobs were hitting the overhead card, and vendor invoices that should have come out of JobEx were being paid from OpEx. By the time the owner noticed, the OpEx account was chronically short and the JobEx account looked healthier than it should have. They wrote a one-page spending policy that defined which costs belonged where, assigned approval authority by dollar threshold, and set a biweekly review to check all account balances against the allocation schedule. Within two quarters, the accounts were tracking the way they were supposed to, and the owner could finally see where overhead was actually going.

Where people get it wrong

Many contractors assume a spending policy is something only big companies need, so approvals live in the owner’s head. When the owner is on a jobsite or out of town, supervisors make their best guess, and overhead purchases end up paid from JobEx or put on a card nobody reviews. Write the policy down, keep it short, and make sure everyone who can spend money knows which account each kind of purchase comes from.

In the book: Profit First for Commercial Construction, Chapter 12, Managing Curveballs: Navigating Cash Flow Disruptions.

Where cash leaks out of a construction company

Retainage kills our cash flow. Won’t Profit First make that worse?

The short answer

Profit First for Construction doesn’t make retainage harder: it makes the cash you do collect work in a disciplined way, so you stop confusing delayed collections with a profitability problem and start managing both clearly.

Why it’s different in construction

Retainage is a timing and working-capital issue, not a structural flaw in the allocation system. On commercial work with retainage held back on every pay app across multiple active jobs, a contractor with 80 to 100 field employees can have a large amount of earned cash sitting in a GC’s or owner’s account for months. That gap is real, but the answer is to price the financing cost of delayed collections into the bid and to stay aggressive on pay-app submissions and collection follow-up, not to adjust allocation percentages or hold profit distributions until retainage releases. Chasing retainage by tweaking your allocation percentages is like adjusting your household budget every time a client is slow to pay: it treats a collection problem as a math problem and solves neither. Collected retainage goes into Income and is allocated at normal percentages like any other deposit; it is not a windfall to spend freely. Profit distributions stay quarterly, based on actual cash in the Profit account, never tied to a project milestone.

From the field

Running close to 100 employees, a low-voltage contractor had always assumed his cash flow problem was retainage. He’d hold off on owner distributions until a big project closed out, then spend the release in a rush: new trucks, bonuses, catch-up on vendor invoices. After two years of that cycle he had almost no reserves. When he implemented Profit First for Construction, the first thing that changed was the discipline of allocating every dollar that came in, retainage releases included, at the same percentages as everything else. Within a year he had a buffer reserve building in the Vault and was taking a modest but consistent quarterly distribution. The retainage timing hadn’t changed at all; his relationship with the cash had.

Where people get it wrong

A common piece of advice is to raise your Profit or POT percentage specifically to compensate for retainage, or to set up a separate retainage reserve account. Both are wrong. Retainage doesn’t change your allocation percentages, and there is no retainage account in this system. The right place to track unreleased retainage is your AR aging report: that’s standard receivables practice, not a Profit First tool.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

How should we manage change orders so they do not create cash leaks?

The short answer

Change orders create cash leaks when work gets done before authorization is in writing, so the practical fix is to document every change, track unapproved items separately in a sub-ledger or job cost detail, follow up on aging approvals before committing significant labor or materials, and treat an unauthorized change order as an uncollected receivable, not a done deal.

Why it’s different in construction

In construction, the gap between verbal approval and written authorization can run weeks, and in that window a contractor is often already buying materials and putting crews on the work. On a pay-app job, an unapproved change order may not hit the next billing cycle, which means the cash outflow happens now and the inflow, if it ever comes, is 30 to 60 days away or more. Tracking unapproved changes in a sub-ledger separate from the main job cost record gives you a clear view of your exposure at any point, and it makes the follow-up conversation with the owner or GC much easier because the numbers are already documented.

From the field

A husband-and-wife roofing shop was doing solid work on commercial re-roofs but kept ending jobs with less cash than the contracts promised. When we dug in, the pattern was clear: they were routinely doing extra decking repairs and flashing work on a handshake, then billing for it weeks later, sometimes after the owner had already paid the base contract and moved on. On one job, about $18,000 in legitimate change-order work went unbilled until after final payment, and collecting it became a fight. They started tracking every unapproved item in a simple sub-ledger the day the extra work was identified, set a rule that no crew would start significant added scope without at least a written email approval, and began following up on any item older than ten days. Within two months, their change-order collection rate improved noticeably and the end-of-job cash surprises stopped.

Where people get it wrong

Treating unapproved change orders as a billing buffer is like running a tab at a bar where the bartender keeps losing the slips: by closing time, half the drinks are gone and so is the record of who ordered them. That thinking turns legitimate earned revenue into a collection problem. By the time you invoice a change order that’s two months old, the owner’s memory of approving it has faded, the budget conversation has moved on, and you’re negotiating instead of collecting.

In the book: Profit First for Commercial Construction, Chapter 10, System Maintenance: Quarterly Reviews and Timely Actions.

Why do contractors run short of tax money at year-end?

The short answer

Contractors run short of tax money because they pay everyone else first and treat taxes as whatever is left over, and in construction, where clients delay payment and retainage locks up cash for months, there’s rarely anything left. Profit First for Construction fixes this by allocating a percentage to Tax every time money comes in, before a single bill gets paid.

Why it’s different in construction

Construction cash flow is lumpy by design: pay apps go out, owners take 30 to 60 days to approve them, retainage sits on the receivables side for months, and meanwhile payroll and subcontractor invoices are due every week. That gap between when you earn money and when you collect it means the bank balance almost never reflects your true tax liability. By the time year-end arrives, the tax bill is real but the cash to cover it has already been spent on job costs and overhead.

From the field

A fire protection contractor with close to 100 employees had a strong year on paper (revenue up roughly 20 percent) but arrived at tax season owing about $180,000 and holding less than $30,000 in the operating account. The owner had been paying subs, payroll, and equipment costs as invoices landed, assuming the next draw would cover taxes later. It never did. After implementing Profit First for Construction, the company began allocating a fixed percentage to a Tax account on every deposit. Twelve months later, when the CPA delivered the tax estimate, the Tax account held more than enough to cover it with a small cushion left over. The owner described it as the first time in fifteen years taxes felt like a planned expense instead of a crisis.

From the book, Chapter 1, pp. 18 to 19

first wife, was a schoolteacher who did RGC’s books on the side, but was never trained in accounting and hated it. After years of Roger never bringing home a consistent paycheck and never spending time with the family because he worked constantly, and always having to cover the company taxes with her teaching paycheck, she had come to resent Roger. Then there was the “incident.” Without telling her, Roger had wiped out their savings and maxed out her personal credit card to cover the cash flow for a job. “The result was a particularly nasty divorce,” Alex said.

Profit First for Commercial Construction

Where people get it wrong

A common belief is that a good accountant will find enough deductions at year-end to make the tax bill manageable, so there’s no need to set money aside during the year. That thinking works until it doesn’t. Deductions reduce the liability; they don’t create cash you didn’t save. The only reliable way to have tax money when it’s due is to allocate for it consistently throughout the year.

In the book: Profit First for Commercial Construction, Chapter 13, Building Resilience: Cash Flow Management in Uncertain Times.

How do I prevent job cash from starving my owner’s paycheck?

The short answer

Separating JobEx from OpEx is what keeps direct job costs from quietly eating your owner’s paycheck: when job money and overhead money live in the same account, the jobs always win. A dedicated Owner’s Compensation account, funded on a consistent schedule, makes your pay a non-negotiable line item instead of whatever happens to be left over.

Why it’s different in construction

Construction cash flow is lumpy by nature: big deposits come in, big sub and material payments go right back out, and it’s easy to convince yourself the business is flush when you’re really just holding other people’s money. The cash-behavior test cuts through that noise: if the cost disappears when the job disappears, it’s JobEx; if you’d keep paying it whether you have work or not, it’s OpEx. That line matters most for labor, where W-2 status or job-cost coding alone doesn’t tell the whole story. Getting the classification right is what makes your Owner’s Comp allocation real rather than theoretical.

From the field

A concrete contractor with about 25 field staff had been running everything through one checking account for years. His field crews were busy, billings looked strong, but his own paycheck was the first thing he skipped whenever a sub invoice landed or materials came due. When we dug into his numbers, job costs and overhead were completely tangled; he had no idea how much of each dollar coming in actually belonged to the business versus the jobs. We set up separate JobEx and OpEx accounts, worked through his labor classifications using the cash-behavior test, and opened a dedicated Owner’s Comp account funded on the same schedule as every other allocation. Within about three months he was paying himself consistently for the first time in years, and he could finally see that two of his recurring crew members were OpEx, not JobEx, which changed his overhead picture significantly.

From the book, Chapter 2, p. 37

We have kept all our people paid—well, except me, so that hopefully, my son could have an easier and better life. I keep thinking that one day this will all pay off, but I’m not getting any younger.” “You haven’t been getting paid?” I asked. “Alex said he had missed some paychecks too.” “Yeah, I’m even more embarrassed about that,” Roger said. “He knew we were having trouble getting money in and offered to wait on his check one week. It has been a constant problem, though, and after the first time, it was easier to ask. Now his wife is pissed at him and, I guess, me because of it. Dan hasn’t missed any checks though, so don’t mention any of this to Alex.

Profit First for Commercial Construction

Where people get it wrong

A common mistake is assuming that if field labor is coded to a job in the accounting system, it automatically belongs in JobEx. Payroll status and job coding are accounting tools, not cash-flow tools. The right question is behavioral: would you still be paying this person if that job didn’t exist? If yes, that cost is overhead, and it needs to come out of OpEx, not out of the money you set aside to pay subs and materials.

In the book: Profit First for Commercial Construction, Chapter 4, Mastering JobEx: Core Insights for Financial Control.

How does Profit First for Construction’s cash-remaining formula help make sure taxes are always funded?

The short answer

Profit First for Construction defines Residual Revenue as the cash left after JobEx and OpEx are covered, and that pool is what funds Profit, Owner’s Comp, and Tax. When you tighten job-cost discipline and control overhead, you directly grow the amount available for taxes instead of hoping something is left over at year-end.

Why it’s different in construction

Masonry and other trade contractors often carry significant material and labor costs that flow through JobEx, which can compress Residual Revenue without the owner realizing it. When a big pay app hits, it’s easy to assume there’s plenty for taxes, but if JobEx and OpEx have quietly grown, that assumption is wrong. The formula makes the math visible: Revenue minus JobEx minus OpEx equals what’s actually available, and the Tax account gets funded from that number on every allocation cycle, not as an afterthought.

From the field

A second-generation masonry contractor had always set aside a rough guess for taxes at year-end, sometimes enough, sometimes not. When they mapped out their CAPs, they found that JobEx and OpEx together were consuming nearly all of their revenue, leaving almost nothing for the Tax account. Rather than panic, they used the Residual Revenue calculation to see exactly where the squeeze was coming from: material costs on a few jobs had crept up without a corresponding price adjustment. Over two quarters, they tightened job-cost tracking and adjusted pricing on new bids. Within six months, the Tax account was being funded consistently on every allocation date, and the owner stopped dreading the call from their accountant in March.

From the book, Chapter 6, p. 106

“That’s simply your construction revenue minus your JobEx minus your OpEx. Ultimately, your Residual Revenue is all you have for you as the owner, and it is split into three bank accounts.

Profit First for Commercial Construction

Where people get it wrong

A common mistake is treating taxes as whatever is left after everything else gets paid. That approach means taxes compete with payroll, supplier invoices, and owner draws, and taxes usually lose. Profit First for Construction flips this: the Tax account gets its percentage off the top of every allocation, the same as every other account, so funding taxes becomes a system rather than a scramble.

In the book: Profit First for Commercial Construction, Chapter 6, Setting Targets: Knowing What to Shoot For.