Home » The Profit First Construction Field Guide » Equipment, debt and credit under Profit First

Profit First for Construction FAQ

Equipment, debt and credit under Profit First

Owned equipment and loan payments are overhead you owe whether the machine is working or not, so they follow their own rules.

Related topics:Growth and scaling: hiring, entities, and special casesTeam, leadership, and culture

Paying for trucks and equipment

Can I pay for a new truck or equipment from JobEx?

The short answer

No. JobEx exists to pay job obligations like materials, subcontractors, bonds, and job-specific rentals, and that money should never be redirected to equipment purchases. Bought or owned equipment is funded from OpEx or from a CapEx account that is itself funded from OpEx.

Why it’s different in construction

In construction it is easy to rationalize an equipment purchase as a job need, especially when a truck or machine will spend most of its time on active projects. But owned equipment has to be paid for whether you have work or not: that makes it overhead, not a job cost. Using JobEx for a truck purchase quietly drains the pool of cash that is supposed to pay your subs and suppliers, which is exactly where contractors get into trouble on a busy job. If your JobEx balance is consistently higher than your near-term job commitments, the right move is to investigate your percentages at quarter-end, not to spend the surplus on equipment.

From the field

A second-generation roofing contractor had been running strong for three years when he noticed a healthy balance sitting in his JobEx account between big jobs. He figured it was idle cash and used about $28,000 of it toward a new service truck. Six weeks later a large commercial reroof ramped up and he was short on supplier payments by the end of the second month. He had to call in a favor from his materials vendor for a 30-day extension and felt the stress of that for the rest of the job. After working through Profit First for Construction with his advisor, he understood that JobEx cash isn’t idle; it’s reserved for obligations already in the pipeline. He set up a CapEx account funded from a slice of his OpEx allocation, and the next truck purchase was planned and painless.

From the book, Chapter 2, p. 35

On top of that, I later learned that Dan had gone out and bought a new truck for himself right after winning the bid on the school job to celebrate. They didn’t even have the contract signed yet, much less the first mobilization draw, and he had already spent money he didn’t have. “Anyway, the first thing I would do is open a new bank account for these expenses,” I said. “Give it a name—I call it ‘JobEx.’ Then, for every dollar that comes in, carve out the appropriate percentage and deposit it in that account. Only pay for your materials and subcontractors from that account.

Profit First for Commercial Construction

In the book: Profit First for Commercial Construction, Chapter 4, Mastering JobEx: Core Insights for Financial Control.

Why might a contractor use a separate CapEx account?

The short answer

A CapEx account lets you accumulate cash from OpEx for equipment purchases and major repairs without disrupting your other accounts: it is an optional tool that works well for contractors with significant equipment needs, and it is always funded from OpEx, never from JobEx.

Why it’s different in construction

Masonry contractors and others who own heavy equipment face repair bills and replacement cycles that can blindside cash flow if there is no dedicated bucket. Setting aside a steady slice of OpEx into CapEx turns an unpredictable spike into a planned expense. It also acts as a brake on impulse buying: if the CapEx account doesn’t have the cash, the timing isn’t right.

From the field

A masonry contractor with roughly sixty employees had a habit of financing every new piece of equipment the moment a salesperson showed up, usually right after a good month. The payments stacked up in OpEx and quietly strangled the business during slower stretches. After opening a CapEx account and funding it from OpEx on a consistent schedule, he had cash sitting and ready when a mixer needed a major overhaul eight months later. More importantly, the account balance gave him an honest answer when the next equipment salesperson called: if the money wasn’t there, the answer was no. He bought one fewer piece of equipment that year and ended the year with a stronger quarterly Profit distribution than he’d seen in a long time.

From the book, Chapter 7, p. 123

“Yeah, I’ve been trying this Profit First method, but I immediately had to raid my OpEx because we had an unexpected repair on one of my biggest excavators.” “Jake, I was just telling Elvis that for companies with major equipment needs, I recommend carving out another bank account from OpEx to gain more clarity on how you are spending money in this category.

Profit First for Commercial Construction

Where people get it wrong

Some contractors pull equipment money out of JobEx when a job is going well, reasoning that the job ‘generated’ the equipment need. That logic is backwards: JobEx exists to pay job obligations, and the Glossary is explicit that CapEx funds must come from OpEx, not JobEx. Using job money for equipment purchases puts you at risk of not being able to pay your subs and suppliers when the bills come due.

In the book: Profit First for Commercial Construction, Chapter 7, Controlling Equipment Costs: Protecting Cash Flow.

How do I know whether the company has enough cash to fund an equipment purchase?

The short answer

Before buying equipment, look at your actual cash across all accounts, upcoming job and overhead obligations, working capital, tax liability, debt service, and backlog: Profit First for Construction gives you no fixed formula or reserve floor for this decision, but a funded CapEx account makes the question much easier to answer honestly.

Why it’s different in construction

Equipment decisions hit construction companies differently than other businesses because the need often feels urgent: a job starts in three weeks and the machine isn’t there. That urgency can push owners into buying with whatever cash happens to be in the bank, without accounting for payroll due Friday, a sub invoice coming due, or a tax deposit next month. A CapEx account funded steadily from OpEx works like checking your wallet before you order: either the money is there or it isn’t, and no amount of urgency changes that answer. If the account isn’t funded, that’s the answer.

From the field

A design-build GC with eight employees landed a nice commercial project and decided it was finally time to buy a piece of equipment the crew had been renting job after job. The owner looked at the Income account, saw a healthy balance after a large draw came in, and pulled the trigger. What he hadn’t accounted for was $40,000 in sub invoices due within 30 days, a quarterly tax deposit, and two months of overhead that would need to be covered before the next draw. Within six weeks he was borrowing on his line of credit to make payroll. After implementing Profit First for Construction, he opened a CapEx account and funded it from OpEx over several months. When the next equipment opportunity came up, the decision was simple: the CapEx account had about $28,000 in it, the rest of his accounts were healthy, and he bought without touching anything else.

From the book, Chapter 7, p. 125

But my point is that we need to plan for capital purchases and stop impulse buying. You may come across a deal on some equipment; I’m not saying you shouldn’t get it. The question to ask is, should you buy something because it’s a deal you can’t pass up and then struggle to make payroll? Is it worth it to wreck your cash flow spending money you don’t have?”

Profit First for Commercial Construction

Where people get it wrong

A common mistake is treating a large retainage check or a fat Income account balance as a signal that the company can afford something. That cash already belongs somewhere: JobEx obligations, OpEx, taxes, and owner’s comp all have claims on it. Buying equipment from whatever happens to be sitting in the bank, without running it through your full picture of obligations, is how profitable-on-paper companies end up cash-broke. The book is direct on this: having more money on hand doesn’t always mean the company is ahead.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

What happens to equipment financing payments after I buy the equipment?

The short answer

Once you buy equipment and take on a financing note, those principal and interest payments become fixed company obligations that belong in OpEx, not JobEx, because you owe them whether or not the equipment is working on a job.

Why it’s different in construction

Steel erection, grading, and other equipment-heavy trades can have hundreds of thousands of dollars tied up in cranes, ironworker tools, and rigging gear. The financing payments on that equipment don’t stop when a job ends or when the equipment sits idle between projects. That fixed cash obligation is exactly what OpEx is designed to cover. Short-term rentals of equipment brought in specifically for one job are a different story: those costs go away when the job goes away, which is why they can still be JobEx.

From the field

A steel erection sub with about 15 employees had been running tight for years without understanding why. The owner was pulling equipment note payments out of whatever account had money, sometimes JobEx, sometimes the checking account he used for everything else. When he mapped out his actual cash obligations for the year, the equipment notes alone came to nearly $180,000, payments that were due every month regardless of whether he had work. Once those payments were built into his OpEx calculation and funded from OpEx on a consistent allocation schedule, his JobEx account stopped getting raided. Within one quarter he could see that his JobEx percentage was actually healthy; the problem had been OpEx all along. He adjusted his bid overhead recovery on the next three jobs and stopped feeling like every project was bleeding him dry.

From the book, Chapter 7, p. 122

“I still don’t understand why you categorize equipment payments as overhead unless I rent specifically for a job,” Elvis said. “I often rent several pieces of equipment before buying them on a long-term lease. […] “These long-term leases,” I said, “when not tied to a specific job, are fixed costs you have to pay even if the equipment isn’t being used. I know the cash outlay can be huge. If that equipment sits idle, it’s costing you money, right?” “Uh-huh,” Elvis said. “Then it is clearly an operating expense,” I said. “On the other hand, equipment rented specifically for a job you can return and stop paying for, right?”

Profit First for Commercial Construction

Where people get it wrong

It’s tempting to classify equipment note payments as JobEx because the equipment is used on jobs. The book is direct on this: you pay those notes whether you have a job or not, which makes them a fixed overhead cost. Putting them in JobEx inflates your apparent job costs, distorts your JobEx signal, and can lead you to underbid future work trying to compete against a number that was never accurate.

In the book: Profit First for Commercial Construction, Chapter 4, Mastering JobEx: Core Insights for Financial Control.

Should I rent or buy equipment under Profit First for Construction?

The short answer

Profit First for Construction treats job-specific rentals as JobEx and owned or long-term-leased equipment as OpEx (or CapEx funded from OpEx), so the rent-versus-buy decision turns on utilization, total cost, financing, and working capital, not on a fixed rule or debt guardrail.

Why it’s different in construction

Construction equipment decisions hit cash flow hard because payments on owned or leased equipment keep coming whether the machine is running or sitting in the yard. Owning a machine that sits idle is like paying rent on a warehouse you’re not using: the bill comes whether the space is occupied or not. A grading or HVAC contractor with a large fleet feels this acutely: idle equipment is a fixed drain on OpEx, while a rental you return when the job ends disappears from your cash obligations along with it. Seasonality makes the idle-cost problem worse, which is exactly why the book recommends a CapEx account and a Drip account for contractors with significant equipment needs, both funded from OpEx, not from JobEx.

From the field

A service and maintenance HVAC company with close to 100 employees had been financing new equipment on short-term lines of credit every time a big service contract came in. The owner figured the contract revenue would cover the payments, but the line kept getting drawn down and never fully paid off, and when two contracts ran long, payroll got tight. Working through Profit First for Construction, they moved all equipment payments into OpEx and started building a CapEx account from OpEx allocations each period. Within about 18 months they had roughly $80,000 set aside, enough to fund the next truck purchase without touching the line of credit. The line of credit went back to being a short-term timing tool, not a permanent equipment fund.

From the book, Chapter 7, p. 127

“Do you think we should just rent all of our equipment all the time? It’s going to cost more money.” “No, that’s not necessarily what I am saying,” I said. “But you do also have to weigh the cost of that equipment sitting idle. If equipment is a cost of doing business, you need to plan for it. Planning for it means knowing what it costs you in cash flow and, ideally, having money set aside to cover payments, maintenance, times when it sits idle, and major repairs. If you don’t, maybe you should hold off on that purchase.”

Profit First for Commercial Construction

Where people get it wrong

A common mistake is using JobEx money to buy or finance owned equipment, reasoning that the equipment was purchased for a specific job. Profit First for Construction is clear: JobEx is for costs that go away when the job goes away. Rentals tied to one job qualify, but purchased or long-term-leased equipment does not, regardless of what triggered the purchase. Funding equipment from JobEx drains the money set aside for job obligations and quietly breaks the system.

In the book: Profit First for Commercial Construction, Chapter 7, Controlling Equipment Costs: Protecting Cash Flow.

Using a line of credit

Can I use a line of credit to buy equipment or fund growth?

The short answer

A line of credit is for short-term timing gaps only: matching short-term revolving debt to a long-lived asset is a mistake, and the right way to fund equipment is through a CapEx reserve built from OpEx over time, or with financing whose term fits the asset and your repayment capacity.

Why it’s different in construction

Design-build GCs often face pressure to buy equipment to win self-perform work, and a dealer offering easy financing makes it feel painless in the moment. But owned equipment becomes a fixed overhead cost you carry whether the equipment is working or sitting idle, and if it was bought on a revolving line of credit, you’re paying short-term interest rates on a long-term asset while the line stays unavailable for the cash-timing gaps it was meant to cover. Long-term leases not tied to a specific job belong in OpEx, and the path to owning equipment outright runs through a CapEx account funded steadily from OpEx.

From the field

A second-generation design-build GC had inherited a habit of buying equipment on the company line of credit whenever a good deal appeared. By the time the second generation took over, the line was perpetually half-drawn and the business carried three pieces of equipment that sat unused for months at a time. Setting up Profit First for Construction forced a clear look at what those payments were actually costing in overhead. They stopped treating the line of credit as a purchasing tool, opened a CapEx account funded from OpEx each allocation cycle, and put a simple rule in place: no equipment purchase until the CapEx account held enough cash to cover it or until they had financing with a term that matched the equipment’s useful life. Within 18 months the line of credit was clear and available for what it was designed for: bridging a slow pay-app month, not buying an excavator.

From the book, Chapter 12, p. 193

“I just wish I had a bigger line of credit for when something like this happens,” Kevin said. “Creating reserves and strengthening your balance sheet is a great way to build your credit rating. If you don’t have a line of credit, a healthy financial statement can go a long way toward establishing one and helping to maintain a good relationship with your bank.” “I got in trouble with running up a line of credit years ago,” Paul said. “It’s easy to do,” I said, “especially for a contractor who hasn’t been taking a regular paycheck. There’s a balance between growing your business and maintaining financial health.”

Profit First for Commercial Construction

Where people get it wrong

Some contractors justify buying equipment on a line of credit because the monthly payment looks smaller than a rental. That comparison ignores the fact that a line of credit is revolving, short-term debt: using it for a five- or seven-year asset means you’re paying the wrong rate for the wrong duration and tying up credit you may desperately need for a cash-flow gap. Using a revolving line of credit to buy a piece of equipment you’ll own for seven years is like financing a truck with a credit card and calling it a car payment: the rate is wrong, the term is wrong, and you’ve just locked up the card you needed for next month’s material float. The book is direct on this point: a line of credit is a last resort for timing gaps, not an operating account and not a purchasing tool.

In the book: Profit First for Commercial Construction, Chapter 8, Debt Discipline: Balancing Leverage and Cash Flow.

What practical limits can keep a line of credit from becoming permanent debt?

The short answer

A line of credit should bridge short, identifiable timing gaps, not fund ongoing operations, and a written policy that defines the purpose, the expected repayment source, and a review trigger for persistent borrowing is the most practical guardrail you can put in place.

Why it’s different in construction

Construction cash flow is genuinely lumpy: pay apps come in batches, material invoices are due before draws arrive, and slow seasons can stretch for months. That seasonal stretch is not a legitimate reason to draw on a line of credit: it is a reserve problem, and the right tool is a Drip or Vault account funded during the busy season. A line of credit is a last resort even for genuine timing gaps, meaning it should be the option you reach for only after reserves are exhausted and the gap is short and identifiable. The danger is when the line starts covering chronic shortfalls (meaning your pricing, overhead, or allocation percentages aren’t working) rather than genuine timing mismatches. Knowing which situation you’re in before you draw on the line is the whole game.

From the field

A small HVAC service and maintenance company with eight employees had carried a line of credit balance for nearly three years straight. The owner assumed it was just how the business worked. When he mapped out where the draws happened, he found that about two-thirds of them occurred in the same six-week slow window every spring, a timing gap he could have covered with a Drip account funded during the busy season. He set up the Drip, stopped drawing on the line during that window, and paid the remaining balance down over about nine months using his quarterly profit split. The line stayed open but sat at zero for the first full year in recent memory.

From the book, Chapter 8, p. 135

“During COVID, supplier prices skyrocketed,” Paul said. “I ended up putting a lot on my line of credit, and now I just don’t know how to get out from under it.” “You didn’t run that debt up overnight, right?” I asked. “No,” Paul replied. “So you’re not going to get out of it overnight either,” I said. “There’s no magic red pill you can take to instantly change your world. You can, however, make serious progress quickly if you manage your debt properly and have a plan.”

Profit First for Commercial Construction

Where people get it wrong

Some contractors treat the line of credit as proof that the bank trusts them, so a bigger line must mean a healthier business. That’s backwards. Profit First for Construction is clear that a line of credit is a last resort for short timing gaps, not an operating account. Relying on it regularly means the underlying cash-flow structure isn’t working, and borrowing more doesn’t fix that: it delays the reckoning and adds interest cost.

In the book: Profit First for Commercial Construction, Chapter 12, Managing Curveballs: Navigating Cash Flow Disruptions.

Credit cards and allocations

Should I pay my credit card statement before or after my allocation run?

The short answer

Profit First for Construction doesn’t require a rigid rule that every credit card payment must happen after an allocation run: what matters is that you follow a consistent schedule, pay from the right account (OpEx or JobEx, depending on what’s on the card), and never let the payment due date sneak up on you because you were waiting on an allocation.

From the field

A husband-and-wife commercial painting contractor started Profit First and immediately tried to follow a strict “allocate first, then pay everything” sequence. Their credit card statement fell on the 8th of the month, two days before their allocation run on the 10th. For three months they paid it late, picking up fees and a rate increase, because they were waiting for the allocation to “officially” fund the account. Once they shifted their allocation run to the 5th and 20th to match their pay-app schedule, the card payment fell naturally after the allocation and the problem disappeared. The rhythm is supposed to serve the business, not create new friction.

In the book: Profit First for Commercial Construction, Chapter 10, System Maintenance: Quarterly Reviews and Timely Actions.

Can a contractor use credit cards to pay subs and buy job materials under Profit First for Construction?

The short answer

Contractors can use credit cards for legitimate job expenses as long as every charge is coded to the correct job or JobEx category and cash is set aside in the JobEx account to pay the card when it comes due.

Why it’s different in construction

Construction cash flow is lumpy: pay apps arrive on a schedule, but material orders and sub payments often can’t wait. A credit card can bridge that gap on a specific job, but only if the JobEx account already holds enough to cover the balance when the statement arrives. Treating the card as a float device rather than a short-term tool is where contractors get into trouble, especially when multiple jobs are running at once and charges blur across projects.

From the field

A steel erection husband-and-wife shop had been putting structural steel hardware and sub invoices on a company card for years, telling themselves they’d pay it off when the draw came in. The draw always came in a little short, or a little late, and the card balance crept up month after month until it was carrying nearly $40,000 at high interest. When they set up Profit First for Construction, they started allocating a JobEx percentage on every deposit and made a rule: the card gets paid in full on allocation day. Within about eight months the revolving balance was gone. The card still gets used for job purchases, but now the cash is already sitting in JobEx before the statement hits.

In the book: Profit First for Commercial Construction, Chapter 2, Facing Reality: Cash Confrontations.

How much debt is safe

How do I know if my debt level is safe for my construction business?

The short answer

Evaluating debt safety in construction means looking at your actual cash flow, backlog quality, margins, repayment capacity, and liquidity together: there is no single ratio or benchmark that tells you whether your debt level is safe.

Why it’s different in construction

Construction debt risk is shaped by factors that don’t show up in a simple ratio: retainage that won’t be released for months, a backlog that looks strong on paper but is full of thin-margin jobs, seasonal revenue gaps, and equipment notes that must be paid whether work is flowing or not. A commercial drywall and framing sub carrying a second-generation family legacy may also have older equipment debt layered under newer working-capital borrowing. Lenders have their own thresholds, but your real test is whether cash flow can service the debt without raiding Profit or Tax accounts and without leaning on a line of credit as a permanent operating account.

From the field

A second-generation commercial drywall and framing sub had grown steadily, and the owner felt confident because the backlog looked healthy. What he hadn’t tracked carefully was that three of his largest contracts were low-margin public jobs with 10% retainage held for six to nine months. When two slow-pay GCs overlapped, his debt service consumed nearly everything coming in through OpEx, and he started floating payroll on a revolving line of credit. After working through Profit First for Construction, he listed every debt (notes, credit cards, the line) with required monthly payments, and mapped them against realistic cash-in timing rather than contract value. He discovered his actual repayment capacity was about half what he’d assumed. He stopped taking on new debt, started a debt snowball from quarterly profit, and within about 18 months had eliminated two smaller notes and meaningfully reduced the line balance.

From the book, Chapter 8, p. 137

“I want you to simply create a list of all your debts—notes payable, credit cards if you’re not paying them off each month, and other lines of credit. Include all of it, along with the required monthly payments for each. You may already have done this when we reviewed operating expenses. Your list will at least show you what you need to cover every month.” […] I tell contractors to put that list in a spreadsheet and then set an order for paying down the debts, with the goal of freeing up operating cash.”

Profit First for Commercial Construction

Where people get it wrong

A common mistake is measuring debt safety against backlog value alone: if the signed contracts cover the notes, the thinking goes, you’re fine. But backlog is future revenue, not present cash, and it can evaporate with a scope reduction, a termination clause, or a slow-pay owner. Debt has to be serviced with actual cash flow, not projected billings, and Profit First for Construction is built around that distinction.

In the book: Profit First for Commercial Construction, Chapter 8, Debt Discipline: Balancing Leverage and Cash Flow.

Ready to put this in place?