Growth costs cash before it pays, so these answers help you check the numbers before you sign.

Related topics:Owner pay and distributionsEquipment, debt, and credit

Growing without running out of cash

How do I know if I should hire a new crew member in commercial construction?

The short answer

Hiring decisions in commercial construction should weigh signed backlog, current margins, receivables aging, payroll-account trends, working-capital needs, and whether the new role can cover its own cost, not a single fixed threshold.

Why it’s different in construction

Commercial construction compounds the hiring question in ways that a simple payroll-cushion number can’t capture. A large deposit or a freshly signed contract can make the bank account look healthy right before a string of pay app delays drains it. Seasonal patterns, crew productivity, and the lag between billing and collection all affect whether you actually have the sustained cash flow to support a new wage. At close to 100 employees, a design-build GC also has to consider whether adding one crew member creates enough economic value to justify the fully loaded cost: salary, payroll taxes, workers’ comp, and any ripple effects on office overhead.

From the field

A design-build GC approaching 100 employees landed a large commercial project and immediately started interviewing for three new crew positions. Revenue looked strong on paper, but receivables had quietly stretched to nearly 60 days on two existing jobs, and the OpEx account was already thin from a recent office expansion. The owner hired all three before the first pay app on the new project came in, and within six weeks payroll was being covered by drawing on the line of credit. We walked back through the numbers and found that the backlog was real but the cash timing wasn’t. After that, the owner started reviewing AR aging and payroll-account trends together before committing to any new hire, and the next round of additions was staged over two quarters instead of all at once.

From the book, Chapter 9, p. 147

Creating a separate percentage for payroll lets you know what you’ve been spending; if you don’t have extra money in that account, for example, you know you can’t afford to pay a new hire. On the other hand, your OpEx account balance can build up quickly and fool you into thinking that you do have the capacity to hire that new person. I’ve had many clients realize that without a clear direction on payroll, they overextend their OpEx.” Roger let out a deep breath. “Been there, done that.”

Profit First for Commercial Construction

Where people get it wrong

A common mistake is treating a signed contract or a large deposit as a green light to hire. Booked revenue tells you work is coming; it doesn’t tell you when the cash will actually arrive or whether your current margins and receivables can carry the added payroll in the meantime. Hiring on the strength of a signed contract is a bit like spending your tax refund before the IRS processes the return: the money is probably coming, but your payroll runs every week regardless. The Construction Growth/Profit Paradox is real: growth that looks like more money often brings higher costs that outpace revenue, especially when receivables are slow.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

What should I evaluate before taking on a major growth opportunity?

The short answer

Before committing to a major growth opportunity, evaluate backlog quality, current workload and staffing capacity, margins, receivables aging, liquidity, debt load, and the additional working capital the expansion will require. Profit First for Construction does not set a universal expansion gate or fixed reserve threshold: reserves are one signal among many, not a pass/fail test.

Why it’s different in construction

Construction growth is particularly cash-hungry because receivables, payables, and working-capital needs tend to scale with revenue: roughly doubling when revenue doubles. A fire protection contractor adding a second crew, for example, may need to carry two or three months of additional payroll and materials before the new work starts paying. Lumpy pay applications and retainage held back on larger commercial contracts can widen that gap further. Forecasting projected cash receipts and outflows for the expanded workload, and identifying what financing or restructuring would be needed if the numbers don’t work, is a practical first step before signing anything.

From the field

A fire protection contractor with about 60 employees was offered a large municipal contract that would have added roughly 40% to annual revenue. The owner was excited and assumed that because the company was profitable on paper, the cash would follow. What he hadn’t mapped out was that the new contract required mobilizing two additional crews, purchasing materials 60 to 90 days before the first pay application, and carrying retainage on a job that wouldn’t close for 18 months. When he ran a simple cash-flow forecast, he realized his existing receivables were already stretching to 75 days and his reserves covered less than three weeks of operating expenses. Rather than walking away, he negotiated better payment terms, tightened collections on current jobs, and built reserves over two quarters before committing. The contract was still available, and he started it from a position that didn’t put the rest of the business at risk.

From the book, Chapter 4, p. 75

He said that he and Roger had talked, and Roger had his blessing to be totally transparent with them. He then shared how RGC had been the lowest bidder by 9% and explained how tight this job would be for them as a company. Then he masterfully explained how growing too fast can spell the death of a contractor because of cash flow. He mentioned how many of them had seen that firsthand in the aftermath of the 2008 Great Recession and shared some of his own previous experiences.

Profit First for Commercial Construction

Where people get it wrong

A common mistake is treating a reserve shortfall as an automatic prohibition on growth rather than as a warning signal that demands closer scrutiny. Being below a desired reserve level is a reason to examine the decision more carefully (stress-test the cash forecast, look at financing options, consider restructuring the opportunity, or delay), not an automatic no. Equally, a contractor who does have reserves shouldn’t assume that clears every other concern; margins, debt, capacity, and receivables all matter too.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

When can project-specific sub-accounts help on large jobs?

The short answer

Project-specific sub-accounts can improve cash visibility and reduce accidental cross-job spending on unusually large or complex jobs, but they are optional: good job-cost accounting and project ledgers often provide the same clarity without extra bank accounts. Retainage does not need its own dedicated account; track it in your accounting system and AR aging.

Why it’s different in construction

On large commercial or government jobs, a dedicated project account can make it easier to see how much cash is actually tied to that contract, catch intermingling issues early, and support owner or lender reporting. The book describes a Texas contractor who had to prove in court where job funds went after an owner alleged commingling: that kind of exposure is real on big jobs. That said, the bank structure is never the primary control; your job-cost records and project ledger carry the detailed accounting. Any threshold you set for opening a project account should come from your own circumstances, not a fixed rule.

From the field

A landscape construction husband-and-wife shop landed their biggest contract ever: a multi-phase commercial development nearly three times the size of anything they’d done before. They ran it through their normal accounts and found themselves constantly second-guessing whether cash on hand belonged to that project or to their smaller residential work running in parallel. Twice in the first two months they accidentally used project mobilization funds to cover a payroll shortfall on a separate job. After opening a single sub-account for that large contract and routing its deposits there, the confusion stopped immediately. They closed the account when the project wrapped up and went back to their standard setup for everything else.

From the book, Chapter 9, p. 150

“I did that a lot more in residential work,” Alex said, “especially with custom home builds funded by the bank. We had to set up dedicated accounts for each project, which made tracking easier and kept the bank happy.” “I had a case with a Texas contractor who was sued for allegedly intermingling funds,” I said. “They didn’t do anything wrong, but the owner ran out of money and used it as an excuse to justify not paying my contractor. The contractor had to prove in court where the money went. They started setting up dedicated accounts for specific projects after that.”

Profit First for Commercial Construction

Where people get it wrong

Some contractors assume they need a separate bank account for retainage on every job. That’s not how Profit First for Construction works: retainage is a timing and working-capital issue tracked in your AR aging, not a reason to open a dedicated reserve or escrow account. When retainage is collected, it goes into Income and is allocated at your normal percentages like any other deposit.

In the book: Profit First for Commercial Construction, Chapter 9, Creating Clarity: Considering Your Banking Needs.

We’re growing fast, so won’t Profit First slow us down or fail to scale with our business?

The short answer

Profit First for Construction scales with growth because it makes the cash consequences of expansion visible before they become a crisis. It doesn’t put the brakes on growth; it helps you grow without running out of cash.

Why it’s different in construction

Construction has a well-documented trap: the Construction Growth/Profit Paradox, where taking on more work actually leaves you with less cash. Hiring crews, stacking pay apps, carrying larger receivables, and buying or renting more equipment all drain working capital faster than revenue arrives. A paving contractor adding two crews and a new paver can double revenue on paper while the checking account hits zero waiting on pay apps. Growing a construction company without that visibility is like flooring the accelerator without checking the fuel gauge: you can go fast right up until you don’t. The system keeps those cash consequences visible so you can make smarter decisions about pace.

From the field

A paving contractor with about 15 employees landed two large municipal contracts in the same season and pushed hard to staff up. Within 60 days, payroll was outrunning collections and the owner was drawing on a line of credit just to make Friday payroll. When he set up Profit First for Construction, the allocation accounts told the story immediately: OpEx was chronically short, and JobEx was being raided to cover overhead. He stopped chasing every bid that came across his desk, focused on jobs with better margins and faster pay cycles, and reviewed his percentages at the end of each quarter. Within two quarters the line of credit was paid off and he had roughly six weeks of operating expenses sitting in a Vault account. Growth didn’t stop; it just stopped bleeding him dry.

From the book, Chapter 14, p. 214

“Believe it or not, you have already started to solve it yourself,” I said. “You have put a system into place that helps. And you should know that I have seen many construction companies grow themselves right out of business because of this exact thing.” “Was that what happened with Precision Prime?” Alex asked. “Could be. From what you guys told me, the signs were there.

Profit First for Commercial Construction

Where people get it wrong

Some advisors tell contractors to “reinvest everything” back into the business during growth phases and skip taking profit until things settle down. That thinking keeps you on a treadmill indefinitely. The book addresses this directly: if “someday” is always the plan, someday never comes. Taking even a small quarterly profit, while retaining the other half in the business to build reserves, is what makes growth sustainable rather than a slow march toward insolvency.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

How should debt and backlog factor into growth decisions?

The short answer

Signed backlog supports planning, but it is not a safe green light on its own: compare it against your actual debt obligations, margins, expected cash conversion, receivables aging, and working-capital capacity before adding leverage or fixed overhead. Profit First for Construction does not prescribe a fixed debt-to-backlog ratio or any guardrail formula.

Why it’s different in construction

Construction backlog is promises, not cash. A signed contract is like a dinner reservation: it holds the table, but the kitchen still has to be paid before anyone eats. A steel erection sub with six months of signed work still has to float labor, materials, and equipment costs weeks or months before pay apps convert to deposits. Retainage withheld on early phases can quietly widen the gap between revenue on paper and cash in hand. Adding fixed overhead or new debt against backlog alone, without stress-testing cash conversion timing, is one of the fastest ways a growing contractor ends up illiquid on a busy year.

From the field

A second-generation steel erection sub had grown steadily and was sitting on what looked like a healthy backlog when the owners decided to take on two large projects simultaneously and finance a new crane to support them. The backlog numbers looked great, but the cash conversion cycle on both jobs ran long, retainage piled up on the first project, and the new debt service hit every month regardless of billing pace. Within two quarters the company was drawing on its line of credit just to make payroll. When they finally sat down and mapped their actual monthly debt obligations against realistic cash-in dates from their pay app schedule, the picture was sobering: roughly $180,000 in monthly obligations against cash conversion that lagged by six to eight weeks. They slowed the second project ramp-up, redirected quarterly profit toward debt paydown, and started reviewing receivables aging alongside backlog at every planning meeting. A year later the line of credit was untouched and reserves were rebuilding.

From the book, Chapter 2, p. 38

As I struggled to get this company off the ground, I kept telling myself, if I can just get to a half million in revenue, everything will change. Then it was, OK, I just need to get to a million and it will all get better. Then it was two million, and last year, I was approaching ten million in revenue. All I’ve done is get deeper in debt and introduce new problems at every level.”

Profit First for Commercial Construction

Where people get it wrong

A common piece of advice is to use a fixed debt-to-backlog ratio as a hard guardrail: something like “keep debt below a set share of signed backlog.” Profit First for Construction does not endorse any such formula. Backlog quality, margin, cash conversion timing, and existing working-capital cushion all vary too much from one contractor to the next for a single ratio to be meaningful, and chasing a formula can give a false sense of safety.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

How do I know when I’m ready to hire or expand?

The short answer

Readiness to hire or expand isn’t one number. It’s a combination of signals: sustained backlog, healthy margins, available working capital, manageable receivables, and enough cash cushion to carry the added payroll burden through a slow stretch. Look at all of them together before you commit.

Why it’s different in construction

Site work and excavation contractors feel this acutely because their equipment costs and crew sizes can jump significantly with even one large new contract. A new operator or laborer isn’t just a weekly paycheck: it’s insurance, tools, potential vehicle costs, and the working capital tied up in receivables that won’t come back for sixty or ninety days. Growth eats cash: if your revenue doubles, your receivables, payables, and working-capital needs roughly double too. Make sure the economics of the new role actually pencil out at your real margins before you sign the offer letter.

From the field

Eight people, a solid reputation, and a backlog that had grown steadily for two years: this excavation contractor looked ready to add a second crew. What they hadn’t mapped out was that the new contracts were sixty-day-pay jobs, and adding five people plus equipment rental would cost them roughly $40,000 a month before the first pay app came in. Their OpEx account couldn’t carry that bridge. We slowed the expansion by about ninety days, used that time to collect some aging receivables and build a small cushion, then brought on two people first to test the workload. The full second crew came six months later, and by then the cash flow could actually support it.

From the book, Chapter 15, p. 228

“What if we see expansion happening instead?” Roger asked. “Maybe it’s time to move to a bigger facility if the business is growing, or hire more staff? I guess we need to figure out what that would do to our overhead.” “And cash flow,” Alex added. “Good,” I said. “This is exactly where I wanted to go with it. Roger, if you see things expanding, ask yourself if it’s because you have taken on more low-margin work. Have you changed your pricing? Are you regularly reviewing costs?”

Profit First for Commercial Construction

Where people get it wrong

A lot of contractors treat a full OpEx account as a green light to hire. The book addresses this directly: an OpEx balance can build up and fool you into thinking you have capacity when the payroll account tells a different story. A separate payroll account gives you a clearer read on what you can actually afford to pay out each cycle, which is a much more honest hiring signal than a lump operating balance.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

What is the construction growth paradox?

The short answer

The Construction Growth/Profit Paradox is the pattern where a contractor’s revenue and accounting profit go up while actual cash goes down, because overhead, receivables, payroll, and working-capital needs tend to grow faster than revenue does, leaving the business cash-starved even as the top line climbs.

Why it’s different in construction

Construction makes this paradox especially sharp. Pay apps lag work by weeks, retainage holds back a slice of every contract until well after completion, and subs and suppliers often need to be paid before the GC pays you. When you double your volume, you roughly double all of those timing gaps at once: it’s like running twice as many job sites on the same working-capital tank, covering more ground until suddenly you can’t. Add a new superintendent, a second truck, and a bigger insurance premium, and overhead can outrun revenue before you notice on a standard P&L.

From the field

A husband-and-wife fire protection shop had been grinding for years at a modest size, then landed two large commercial contracts back to back and nearly doubled their billings in one year. On paper it looked like a breakthrough. In practice, they were constantly scrambling: payroll hit before draw payments arrived, a supplier demanded COD terms because the account balance had swung so wildly, and the owner stopped taking a paycheck for two months to keep the lights on. When we mapped out the cash flow, the problem was clear: their working capital needs had roughly doubled with the revenue, but they had no reserves and no system to see it coming. Once they started allocating consistently and built a buffer over the following year, the growth became something they could actually sustain.

From the book, Chapter 14, p. 212

“Because I have the opposite problem,” he said. “Sure, plenty of money is coming in, but I can’t seem to keep any of it. I thought things would smooth out as I added to my top line revenue, but it’s actually been the opposite; I’ve been even more strapped for cash.” […] “This is what I refer to as the ‘Construction Growth/Profit Paradox,’” I said.

Profit First for Commercial Construction

Where people get it wrong

The most dangerous version of this myth is the belief that the next big job will fix the cash problem. It usually makes it worse, because bigger jobs bring bigger upfront costs, longer payment cycles, and more exposure before a dollar comes back in. Profit First for Construction is built specifically to counter that thinking by measuring cash-based profitability, not just what the income statement says.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

How do I use Profit First for Construction alongside my EOS L10 meeting agenda?

The short answer

Profit First for Construction and EOS run well together: bring your relevant cash issues into the Scorecard, Rocks, IDS, and To-Dos sections of the L10 using the same account structure and allocation rhythm you already run. No special branded review steps, proprietary sheets, or extra rituals are needed.

Why it’s different in construction

A paving contractor with around 60 employees deals with seasonal billing swings, equipment-heavy overhead, and pay apps that can bunch up or go quiet for weeks. Those are exactly the issues that belong on an L10 Scorecard as measurables: things like days outstanding on receivables, JobEx account balance relative to upcoming sub and materials obligations, and whether OpEx is tracking with revenue. Putting real cash numbers in front of the leadership team weekly means billing delays, estimating drift, or overhead creep get caught in the meeting rather than discovered at quarter-end.

From the field

A paving contractor running about 60 people had been on EOS for two years and liked the L10 format, but the financial portion of every meeting was vague; someone would say cash was “okay” or “a little tight” and the team moved on. After implementing Profit First for Construction, the owner started dropping four account balances into the Scorecard each week: Income cleared, JobEx available, OpEx available, and Profit accumulated. Within a month the team could see a pattern: JobEx was consistently thin in the two weeks before a pay app and flush right after. That visibility turned into an IDS item about tightening the billing cycle, which shaved about three weeks off their average collection time over the following quarter. No new meeting format was needed; the existing L10 just got real numbers.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

How do I run allocations across multiple entities without losing my JobEx signal?

The short answer

Running Profit First allocations across multiple entities works best when every entity follows the same rhythm (allocate from Income first, before paying vendors, debt, or intercompany invoices), so each entity’s JobEx and OpEx signals stay truthful and comparable.

Why it’s different in construction

Construction companies often split into multiple entities for licensing, liability, or tax reasons, and intercompany invoices can blur the JobEx signal fast. A low-voltage contractor with close to 100 employees might have a service entity, an installation entity, and a holding company, each with its own pay apps and vendor obligations. If one entity pays another before allocating, the paying entity’s JobEx looks artificially high and the receiving entity’s Income looks inflated. Keeping the allocation-first discipline in every entity, on the same schedule, is what keeps the signals honest across the whole enterprise.

From the field

A low-voltage and security contractor with roughly 90 employees had grown into three entities over the years: one for commercial installs, one for service contracts, and a holding company that owned the vehicles and equipment. The owner noticed that his install entity always looked cash-strapped while the holding company always looked flush, but he couldn’t tell whether the install work was actually profitable. The problem turned out to be simple: the install entity was paying the holding company’s intercompany invoice before allocating, so JobEx was being pulled down before Income was ever split. Once every entity started allocating from Income first on the same biweekly schedule, and intercompany invoices were treated like any other vendor obligation paid from the right account after allocation, the install entity’s JobEx signal became readable within about six weeks. Within two quarters the owner could see clearly which entity was carrying the others and made a pricing adjustment on the service side that added roughly $80,000 to annual margin.

Where people get it wrong

A common mistake in multi-entity setups is treating an intercompany transfer as a pass-through that doesn’t need to go through allocation. The logic sounds reasonable (it’s just moving money between your own companies), but it corrupts the JobEx and OpEx signals in both entities. Every dollar that comes into an entity’s Income account gets allocated first, full stop, regardless of where it came from.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.

How do I evaluate whether cash flow can support a new hire or equipment purchase?

The short answer

Evaluating a new hire or equipment purchase means looking at backlog quality, margins, receivables, payroll-account trends, liquidity, debt, and working-capital needs together, not checking a single number against a fixed threshold. For equipment, also weigh utilization, total cost of ownership, financing terms, and expected return before committing.

Why it’s different in construction

Construction cash flow is lumpy by nature: pay apps come in waves, deposits can look like profit, and a fat bank balance after a big draw can disappear fast when subs and suppliers hit. A large deposit sitting in your account before the work starts is like lumber stacked in the driveway: it looks like progress, but it’s already committed to the job. A second-generation plumbing shop, for example, might see strong billings for three months and assume it can carry a new crew, only to find that receivables stretch out and the next pay app is six weeks away. Hiring or buying equipment right after a large deposit, before that money has been earned and allocated, is one of the most common ways contractors get into trouble. Weigh the timing of expected cash inflows against the ongoing obligation you’re about to take on.

From the field

A second-generation plumbing contractor with about 30 employees had been running busy for two years straight. Revenue looked great, the owner felt confident, and he pulled the trigger on both a new service van and a second field foreman in the same month. What he hadn’t tracked carefully was that three large jobs were all billing on similar schedules; when two of them hit a slow stretch and pay apps were delayed by nearly six weeks, payroll got tight and the van payment came due anyway. He came in stressed and short on answers. We mapped out his backlog by expected billing date, looked at his AR aging, and built a simple cash-flow projection 90 days out. The picture was clear: the foreman made sense because backlog was real and margins were solid, but the van purchase should have waited another quarter until reserves were in better shape. He kept the foreman, deferred a second vehicle, and set up a CapEx account funded from OpEx so the next equipment decision would have its own savings behind it. Twelve months later he had roughly two months of operating expenses in reserve and bought the van without stress.

From the book, Chapter 9, p. 147

Creating a separate percentage for payroll lets you know what you’ve been spending; if you don’t have extra money in that account, for example, you know you can’t afford to pay a new hire. On the other hand, your OpEx account balance can build up quickly and fool you into thinking that you do have the capacity to hire that new person. I’ve had many clients realize that without a clear direction on payroll, they overextend their OpEx.” Roger let out a deep breath. “Been there, done that.”

Profit First for Commercial Construction

Where people get it wrong

A common piece of bad advice is to use a fixed payroll-cushion threshold as a hiring gate, where you don’t hire until a set payroll cushion is sitting in the bank. That kind of hard gate ignores backlog quality, margin, seasonality, and debt load, and it can just as easily lead you to hire too late as too early. Payroll-account balances are one signal to weigh, not a pass/fail test.

In the book: Profit First for Commercial Construction, Chapter 14, Growing Wisely: Balancing Expansion with Cash Stability.